Difference between revisions of "Materials:(Flynn) Quadro SS150 Snap Seam"

Jump to: navigation, search

Difference between revisions of "Materials:(Flynn) Quadro SS150 Snap Seam"

(PERFORMANCE REQUIREMENTS)
Line 40: Line 40:
 
====PERFORMANCE REQUIREMENTS====
 
====PERFORMANCE REQUIREMENTS====
 
#'''Wind Uplift Standards''': Engineered designs to resist wind uplift may refer to the British Columbia Building Code, Div. B, Appendix C, Table C-2 which lists various types of loads, including wind loads, for specific reference locations throughout the province. See also [http://{{SERVERNAME}}/index.php?title=ASM_Application_Guides_and_Notes Guides and Notes (Wind Resistance)] for a simplified calculation procedure. Regardless of the resources indicated here, the Design Authority is responsible to perform accurate wind load calculations and specify securement requirements.
 
#'''Wind Uplift Standards''': Engineered designs to resist wind uplift may refer to the British Columbia Building Code, Div. B, Appendix C, Table C-2 which lists various types of loads, including wind loads, for specific reference locations throughout the province. See also [http://{{SERVERNAME}}/index.php?title=ASM_Application_Guides_and_Notes Guides and Notes (Wind Resistance)] for a simplified calculation procedure. Regardless of the resources indicated here, the Design Authority is responsible to perform accurate wind load calculations and specify securement requirements.
#'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the standards published in the [http://rpm.rcabc.org/index.php/RoofStar_Guarantee_Standards_for_ASM_Roof_Assemblies RoofStar Guarantee Standards for ASM Roof Assemblies].
+
#'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the standards published in the [http://rpm.rcabc.org/index.php/RoofStar_Guarantee_Standards_for_ASM_Systems RoofStar Guarantee Standards for ASM Systems].
  
 
<hr>
 
<hr>

Revision as of 21:51, 28 April 2020


The metal panel listed and described below is accepted for use in the RoofStar Guarantee Program.
Manufacturer
Flynn Canada Ltd.
Contact Address
See the current Membership list and contact information at www.rcabc.org
Product Group - Standing Seam Metal Roof System
Panel Machine
Schlebach Quadro
Panel Name
Quadro SS 100 (Snap Seam)
Seam Type
Snap Lock

The roofing assembly / material information published below and in the RCABC Roofing Practices Manual DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer.

OVERVIEW

QUADRO Panel Machine is an on-site/in-shop continuous metal roofing panel roll forming machine. This machine produces Snap Seam – SS 100 with a seam height of 25 mm (1"). This machine can produce either a Nail Strip System or a Clip System. Panels can be produced from 225 mm (9") wide up to 400mm (16") wide.

On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').

SYSTEM DESCRIPTION

  1. General: Standing seam panels use a hidden fastening clip system for mechanical fastening to a solid substrate. The maximum spacing of the clips is 600 mm (24") on centre. The panels are locked together, with the clips as part of the seam, by use of a mechanical seamer.
  2. Range of application: On wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
  3. Fasteners (Screws): Fasteners used to attach panel clips to plywood must be No. 10-12 by 25 mm (1") long pancake head, No. 2 Phillips drive, A-point, coated steel screw. Minimum two fasteners per clip to be used.
  4. Panel Clips: One piece assembly 43.75 mm (1-3/4") wide, 31 mm (1-1/4") high. Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced 600 mm (24") on centre fastened to plywood deck. Englert “Series 1000 Interlocking Clip”.

PROFILE

N/A

TECHNICAL DATA SHEET

N/A

SITE CONDITIONS

Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").

PERFORMANCE REQUIREMENTS

  1. Wind Uplift Standards: Engineered designs to resist wind uplift may refer to the British Columbia Building Code, Div. B, Appendix C, Table C-2 which lists various types of loads, including wind loads, for specific reference locations throughout the province. See also Guides and Notes (Wind Resistance) for a simplified calculation procedure. Regardless of the resources indicated here, the Design Authority is responsible to perform accurate wind load calculations and specify securement requirements.
  2. Materials:RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the standards published in the RoofStar Guarantee Standards for ASM Systems.


Back to Site-Formed Metal Roofing Systems

Back to Accepted Materials


Home