Difference between revisions of "ASM Ridge (Unvented, Uninsulated)"

Jump to: navigation, search

Difference between revisions of "ASM Ridge (Unvented, Uninsulated)"

Line 27: Line 27:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[ASM Roof Systems Standard#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.
+
;(1) [[ASM Roof Systems Standard#PART_8|'''Underlayment''']]: The type of underlay required is determined by roof slope.
;(2) [[ASM Roof Systems Standard#ASMSLIP|'''Ventilation layer''']]: A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
+
;(2) [[ASM Roof Systems Standard#PART_8|'''Ventilation layer''']]: A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
;(3) [[ASM Roof Systems Standard#ASMCLIP |'''Architectural metal panel clip''']]
+
;(3) [[ASM Roof Systems Standard#PART_9 |'''Architectural metal panel clip''']]
;(4) [[ASM Roof Systems Standard#ASMZ |''''Z' Closure''']]: Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
+
;(4) [[ASM Roof Systems Standard#PART_10 |''''Z' Closure''']]: Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
;(5) [[ASM Roof Systems Standard#ASMSEALANT |'''Sealant''']]
+
;(5) [[ASM Roof Systems Standard#PART_10 |'''Sealant''']]
;(6) [[ASM Roof Systems Standard#ASMDRAG |'''Drag-load fasteners''']]: Compatible non-corrosive fasteners.
+
;(6) [[ASM Roof Systems Standard#PART_10 |'''Drag-load fasteners''']]: Compatible non-corrosive fasteners.
;(7) [[ASM Roof Systems Standard#ASMCLOSURE |'''Architectural metal roof panel''']]: Top end of panels must be "bread-panned".
+
;(7) [[ASM Roof Systems Standard#PART_10 |'''Architectural metal roof panel''']]: Top end of panels must be "bread-panned".
;(8) [[ASM Roof Systems Standard#ASMZ | '''Ridge cap flashing''']]: Cut away to reveal 'Z' closure and drag-load fasteners.
+
;(8) [[ASM Roof Systems Standard#PART_10 | '''Ridge cap flashing''']]: Cut away to reveal 'Z' closure and drag-load fasteners.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[ASM Roof Systems Standard#ASMDECK|'''Acceptable Deck''']]
+
;(A) [[ASM Roof Systems Standard#PART_2|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->

Revision as of 17:33, 28 June 2022



Division D - Construction Details


ASM | Ridge (Unvented, Uninsulated) ( Article 10.3.2.3. and Article 10.3.4.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

ASM 10.4.1 Ridge (Unvented).jpg

Click below for a printable version of this page (N/A)
Print Sheet


1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) Ventilation layer
A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
(3) Architectural metal panel clip
(4) 'Z' Closure
Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
(5) Sealant
(6) Drag-load fasteners
Compatible non-corrosive fasteners.
(7) Architectural metal roof panel
Top end of panels must be "bread-panned".
(8) Ridge cap flashing
Cut away to reveal 'Z' closure and drag-load fasteners.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.