Difference between revisions of "Materials:(Lam) Schlebach 1""

Jump to: navigation, search

Difference between revisions of "Materials:(Lam) Schlebach 1""

(PERFORMANCE REQUIREMENTS)
(PERFORMANCE REQUIREMENTS)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
__NOTOC__
 
__NOTOC__
 
__NONUMBEREDHEADINGS__
 
__NONUMBEREDHEADINGS__
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
 +
<big><big>Division C - Accepted Materials</big></big>
 +
<hr>
 +
<big><big><big><big><big>Schlebach 1"</big></big></big></big></big><br>
 +
<big><big><big>by Lam Metal Contracting Ltd.</big></big></big><br>
 
{| class="wikitable"
 
{| class="wikitable"
 
|-
 
|-
Line 26: Line 32:
 
#'''Fasteners (Screws)''': To secure panel clips to steel, use No. 12-16 by 22 mm (1") long self-drilling, self-tapping, hex-washer head plated steel screws without sealing washers. Two fasteners per panel clip used, inserted into panel clip guide holes.
 
#'''Fasteners (Screws)''': To secure panel clips to steel, use No. 12-16 by 22 mm (1") long self-drilling, self-tapping, hex-washer head plated steel screws without sealing washers. Two fasteners per panel clip used, inserted into panel clip guide holes.
 
#'''Panel Clips''': Two-piece assembly consisting of a No. 18 or No. 16 MSG min. thick coated steel base approximately 22 mm (1") wide x 125 mm (5") long and No. 24 MSG min thick steel upper tap section height 22 mm (1") as manufactured by metal Roofing Supply Inc. in Denver. One panel clip spaced at 600 mm (24") O.C.
 
#'''Panel Clips''': Two-piece assembly consisting of a No. 18 or No. 16 MSG min. thick coated steel base approximately 22 mm (1") wide x 125 mm (5") long and No. 24 MSG min thick steel upper tap section height 22 mm (1") as manufactured by metal Roofing Supply Inc. in Denver. One panel clip spaced at 600 mm (24") O.C.
 +
#'''Deck Requirements''': in keeping with the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].
  
 
====PROFILE====
 
====PROFILE====
Line 37: Line 44:
  
 
====PERFORMANCE REQUIREMENTS====
 
====PERFORMANCE REQUIREMENTS====
#'''Wind Uplift Standards''': Engineered designs to resist wind uplift may refer to the British Columbia Building Code, Div. B, Appendix C, Table C-2 which lists various types of loads, including wind loads, for specific reference locations throughout the province. See also [http://{{SERVERNAME}}/index.php?title=ASM_Application_Guides_and_Notes Guides and Notes (Wind Resistance)] for a simplified calculation procedure. Regardless of the resources indicated here, the Design Authority is responsible to perform accurate wind load calculations and specify securement requirements.
+
<ol>
#'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the standards published in the [http://rpm.rcabc.org/index.php/RoofStar_Guarantee_Standards_for_ASM_Systems RoofStar Guarantee Standards for ASM Systems].
+
<li>'''Wind Uplift Resistance''': Panel securement shall conform to the requirements in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#PART_3 Part 3] of the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].
 +
<li>'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#Section_9.2._Materials Section 9.2.] of the Standard.
 +
</li></ol>
  
 
<hr>
 
<hr>

Latest revision as of 17:15, 26 October 2023



Division C - Accepted Materials


Schlebach 1"
by Lam Metal Contracting Ltd.

The metal panel listed and described below is accepted for use in the RoofStar Guarantee Program.
Manufacturer
Lam Metal Contracting Ltd.
Contact Address
See the current Membership list and contact information at www.rcabc.org
Product Group - Standing Seam Metal Roof System
Panel Machine
Panel Name
Schlebach 1"
Seam Type
Mechanical Lock

The roofing assembly / material information published below and in the RCABC Roofing Practices Manual DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer.

OVERVIEW

The Schlebach 1" Standing Seam metal roofing is a shop formed and an on-site continuous panel metal roofing machine. Panel profiles vary from 300 mm (12") to 500 mm (20") (standard width is 13", 15" or 20") with a seam height of 1". It can be rolled square, tapered and curved. It comes with no stiffening rib, with stiffening ribs and striation.

SYSTEM DESCRIPTION

  1. General: Standing seam panels employ a hidden fastening system for securement to a solid substrate. Panels are seamed together with a mechanical seamer.
  2. Range of application: on wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
  3. Fasteners (Screws): To secure panel clips to steel, use No. 12-16 by 22 mm (1") long self-drilling, self-tapping, hex-washer head plated steel screws without sealing washers. Two fasteners per panel clip used, inserted into panel clip guide holes.
  4. Panel Clips: Two-piece assembly consisting of a No. 18 or No. 16 MSG min. thick coated steel base approximately 22 mm (1") wide x 125 mm (5") long and No. 24 MSG min thick steel upper tap section height 22 mm (1") as manufactured by metal Roofing Supply Inc. in Denver. One panel clip spaced at 600 mm (24") O.C.
  5. Deck Requirements: in keeping with the Standard for Architectural Sheet Metal (ASM) Systems.

PROFILE

N/A

TECHNICAL DATA SHEET

N/A

SITE CONDITIONS

  1. Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").

PERFORMANCE REQUIREMENTS

  1. Wind Uplift Resistance: Panel securement shall conform to the requirements in Part 3 of the Standard for Architectural Sheet Metal (ASM) Systems.
  2. Materials:RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in Section 9.2. of the Standard.


Back to Site-Formed Metal Roofing Systems

Back to Accepted Materials


Home