Difference between revisions of "Materials:(Flynn) SS 100"

Jump to: navigation, search

Difference between revisions of "Materials:(Flynn) SS 100"

(PERFORMANCE REQUIREMENTS)
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
Manufacturer: <b>FLYNN CANADA LTD.</b>  
+
__NOTOC__
 +
__NONUMBEREDHEADINGS__
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
  
Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']
+
<big><big>Division C - Accepted Materials</big></big>
 +
<hr>
 +
<big><big><big><big><big>SS 100</big></big></big></big></big><br>
 +
<big><big><big>by Flynn Canada Ltd.</big></big></big><br>
 +
{| class="wikitable"
 +
|-
 +
| style="background-color: #ffffcc; column-width:100%" | The metal panel listed and described below is accepted for use in the '''''RoofStar Guarantee Program'''''.
 +
|}
 +
{| class="wikitable"
 +
|-
 +
|
 +
;'''Manufacturer''': Flynn Canada Ltd.
 +
;'''Contact Address''': See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ www.rcabc.org]
 +
;'''Product Group - Standing Seam Metal Roof System'''
 +
;'''Panel Machine''': New Tech Machinery
 +
;'''Panel Name''': SS 100
 +
;'''Seam Type''': Mechanical Lock
  
Product Group: <b>STANDING SEAM METAL ROOF SYSTEM &#8211; SEAM LOCK &#8211; SS150 PANEL AND SS100 PANEL</b>
+
The roofing assembly / material information published below and in the [http://{{SERVERNAME}}/index.php?title=Main_Page RCABC Roofing Practices Manual] DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority.  For more information about this product or system, consult the manufacturer.
 +
|}
  
;DESCRIPTION
+
====OVERVIEW====
:The New Tech Machinery Panel Machine is an on-site continuous metal roofing panel roll forming machine. This machine produces Seam Lock &#8211; SS 150 with a seam height of 38 mm (1-1/2") and Seam Lock &#8211; SS 100 with a seam height of 22 mm (1"). Both panel profiles vary from 300 mm (12") to 500 mm (20") wide.  
+
The New Tech Machinery Panel Machine is an on-site continuous metal roofing panel roll forming machine. This machine produces Seam Lock &#8211; SS 150 with a seam height of 38 mm (1-1/2") and Seam Lock &#8211; SS 100 with a seam height of 22 mm (1"). Both panel profiles vary from 300 mm (12") to 500 mm (20") wide.  
  
:On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').
+
On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').
  
;1.1 <u>GENERAL</u>
+
====SYSTEM DESCRIPTION====
:The roofing assembly / material information published in the <b>RCABC <i>Roofing Practices Manual</i></b> DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority.
+
#'''General''': Standing seam panels use a hidden fastening clip system for mechanical fastening to a solid substrate. The maximum spacing of the clips is 600 mm (24") on centre. The panels are locked together, with the clips as part of the seam, by use of a mechanical seamer.
 +
#'''Range of application''': On wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
 +
#'''Fasteners (Screws)''': Fasteners used to attach panel clips to plywood must be No. 10-12 by 25 mm (1") long pancake head, No. 2 Phillips drive, A-point, coated steel screw. Minimum two fasteners per clip to be used.  
 +
#'''Panel Clips''': One-piece assembly 43.75 mm (1-3/4") wide, 31 mm (1-1/4") high. Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced 600 mm (24") O.C. fastened to plywood deck. <i>Englert</i> &#8220;Series 1000 Interlocking Clip&#8221;.
 +
#'''Deck Requirements''': in keeping with the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].
  
;1.2 <u>SYSTEM DESCRIPTION</u>
+
====PROFILE====
:.1 Standing seam panels use a hidden fastening clip system for mechanical fastening to a solid substrate. The maximum spacing of the clips is 600 mm (24") on centre. The panels are locked together, with the clips as part of the seam, by use of a mechanical seamer.
+
N/A
:.2 Range of application: on wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for reroofing or new construction.
 
:.3 <b>Panel Attachment:</b>
 
:;<u>Fasteners (Screws)</u>
 
::Fasteners used to attach panel clips to plywood to be No. 10-12 by 25 mm (1") long pancake head, No. 2 Phillips drive, A-point, coated steel screw. Minimum two fasteners per clip to be used.
 
:;<u>Roof Deck Fasteners (Panel Clips)</u>
 
::One piece assembly 43.75 mm (1-3/4") wide, 31 mm (1-1/4") high. Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced 600 mm (24") on centre fastened to plywood deck. <i>Englert</i> &#8220;Series 1000 Interlocking Clip&#8221;.
 
  
;1.3 <u>SITE CONDITIONS</u>
+
====TECHNICAL DATA SHEET====
:.1 Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").
+
N/A
  
;1.4 <u>PERFORMANCE REQUIREMENTS</u>
+
====SITE CONDITIONS====
 +
Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").
  
:#'''Wind Uplift Standards''': Engineered designs to resist wind uplift may refer to the British Columbia Building Code, Div. B, Appendix C, Table C-2 which lists various types of loads, including wind loads, for specific reference locations throughout the province. See also [http://{{SERVERNAME}}/index.php?title=ASM_Application_Guides_and_Notes Guides and Notes (Wind Resistance)] for a simplified calculation procedure. Regardless of the resources indicated here, the Design Authority is responsible to perform accurate wind load calculations and specify securement requirements.
+
====PERFORMANCE REQUIREMENTS====
:#'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the standards published in the [http://rpm.rcabc.org/index.php/RoofStar_Guarantee_Standards_for_ASM_Roof_Assemblies Architectural Sheet Metal (ASM) Roof Standards].
+
<ol>
 +
<li>'''Wind Uplift Resistance''': Panel securement shall conform to the requirements in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#PART_3 Part 3] of the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].
 +
<li>'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#Section_9.2._Materials Section 9.2.] of the Standard.
 +
</li></ol>
  
 
<hr>
 
<hr>

Latest revision as of 17:11, 26 October 2023



Division C - Accepted Materials


SS 100
by Flynn Canada Ltd.

The metal panel listed and described below is accepted for use in the RoofStar Guarantee Program.
Manufacturer
Flynn Canada Ltd.
Contact Address
See the current Membership list and contact information at www.rcabc.org
Product Group - Standing Seam Metal Roof System
Panel Machine
New Tech Machinery
Panel Name
SS 100
Seam Type
Mechanical Lock

The roofing assembly / material information published below and in the RCABC Roofing Practices Manual DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer.

OVERVIEW

The New Tech Machinery Panel Machine is an on-site continuous metal roofing panel roll forming machine. This machine produces Seam Lock – SS 150 with a seam height of 38 mm (1-1/2") and Seam Lock – SS 100 with a seam height of 22 mm (1"). Both panel profiles vary from 300 mm (12") to 500 mm (20") wide.

On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').

SYSTEM DESCRIPTION

  1. General: Standing seam panels use a hidden fastening clip system for mechanical fastening to a solid substrate. The maximum spacing of the clips is 600 mm (24") on centre. The panels are locked together, with the clips as part of the seam, by use of a mechanical seamer.
  2. Range of application: On wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
  3. Fasteners (Screws): Fasteners used to attach panel clips to plywood must be No. 10-12 by 25 mm (1") long pancake head, No. 2 Phillips drive, A-point, coated steel screw. Minimum two fasteners per clip to be used.
  4. Panel Clips: One-piece assembly 43.75 mm (1-3/4") wide, 31 mm (1-1/4") high. Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced 600 mm (24") O.C. fastened to plywood deck. Englert “Series 1000 Interlocking Clip”.
  5. Deck Requirements: in keeping with the Standard for Architectural Sheet Metal (ASM) Systems.

PROFILE

N/A

TECHNICAL DATA SHEET

N/A

SITE CONDITIONS

Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").

PERFORMANCE REQUIREMENTS

  1. Wind Uplift Resistance: Panel securement shall conform to the requirements in Part 3 of the Standard for Architectural Sheet Metal (ASM) Systems.
  2. Materials:RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in Section 9.2. of the Standard.


Back to Site-Formed Metal Roofing Systems

Back to Accepted Materials


Home