Difference between revisions of "Materials:(Lam) ESE 100"

Jump to: navigation, search

Difference between revisions of "Materials:(Lam) ESE 100"

(PERFORMANCE REQUIREMENTS)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
__NOTOC__
 
__NOTOC__
 
__NONUMBEREDHEADINGS__
 
__NONUMBEREDHEADINGS__
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
 +
<big><big>Division C - Accepted Materials</big></big>
 +
<hr>
 +
<big><big><big><big><big>ESE 100</big></big></big></big></big><br>
 +
<big><big><big>by Lam Metal Contracting Ltd.</big></big></big><br>
 
{| class="wikitable"
 
{| class="wikitable"
 
|-
 
|-
Line 40: Line 46:
  
 
====PERFORMANCE REQUIREMENTS====
 
====PERFORMANCE REQUIREMENTS====
#'''Wind Uplift Standards''': Engineered designs to resist wind uplift may refer to the British Columbia Building Code, Div. B, Appendix C, Table C-2 which lists various types of loads, including wind loads, for specific reference locations throughout the province. See also [http://{{SERVERNAME}}/index.php?title=ASM_Application_Guides_and_Notes Guides and Notes (Wind Resistance)] for a simplified calculation procedure. Regardless of the resources indicated here, the Design Authority is responsible to perform accurate wind load calculations and specify securement requirements.
+
<ol>
#'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the standards published in the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].
+
<li>'''Wind Uplift Resistance''': Panel securement shall conform to the requirements in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#PART_3 Part 3] of the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].
 +
<li>'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#Section_9.2._Materials Section 9.2.] of the Standard.
 +
</li></ol>
  
 
<hr>
 
<hr>

Latest revision as of 17:14, 26 October 2023



Division C - Accepted Materials


ESE 100
by Lam Metal Contracting Ltd.

The metal panel listed and described below is accepted for use in the RoofStar Guarantee Program.
Manufacturer
Lam Metal Contracting Ltd.
Contact Address
See the current Membership list and contact information at www.rcabc.org
Product Group - Standing Seam Metal Roof System
Panel Machine
ESE Machines
Panel Name
ESE 100
Seam Type
Mechanical Lock

The roofing assembly / material information published below and in the RCABC Roofing Practices Manual DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer.

OVERVIEW

The ESE 100 Standing Seam Metal roof is shop formed and on site continuous panel metal roofing machine. Panel profiles vary from 330 mm (13") to 533 mm (21") wide with a seam height of 25 mm (1"). Standard width is 13", 15" or 21". It can be formed with optional stiffening ribs or striation to reduce oil canning. The panel can also be formed into curved and tapered panels. Batterns can be attached to the 1" seam height for a more distinct architectural look.

SYSTEM DESCRIPTION

  1. General: Standing seam panels use a hidden fastening system for securement to a solid substrate. The panels are seamed together with a mechanical seamer.
  2. Range of application: on wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
  3. Fasteners (Screws): For panel clip to steel attachment to be No. 13-16 by 22 mm (1") long self-drilling, self-tapping, hex-washer head plated steel screws used without sealing washers. Two fasteners per panel clip used, inserted into panel clip guide holes.
  4. Panel Clips:
    1. One-piece clips are 1.5" wide by 1" high with a 1" base in 24 Ga., as manufactured by Lam Metal.
    2. Two-part clip assembly consists of a 24 Ga. minimum thick coated steel base approximately 1" wide x 5" long, together with a 24 Ga. minimum thick steel upper tap section height 1" as manufactured by Logan Stamping Ltd.
  5. Deck Requirements: in keeping with the Standard for Architectural Sheet Metal (ASM) Systems.

PROFILE

N/A

TECHNICAL DATA SHEET

N/A

SITE CONDITIONS

Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").

PERFORMANCE REQUIREMENTS

  1. Wind Uplift Resistance: Panel securement shall conform to the requirements in Part 3 of the Standard for Architectural Sheet Metal (ASM) Systems.
  2. Materials:RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in Section 9.2. of the Standard.


Back to Site-Formed Metal Roofing Systems

Back to Accepted Materials


Home