Materials:(Metro) SS 150

Jump to: navigation, search

Materials:(Metro) SS 150

Revision as of 17:24, 26 October 2023 by James Klassen (talk | contribs) (PERFORMANCE REQUIREMENTS)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)



Division C - Accepted Materials


SS 150
by Metro Roofing & Sheet Metal Ltd.

The metal panel listed and described below is accepted for use in the RoofStar Guarantee Program.
Manufacturer
Metro Roofing & Sheet Metal Ltd.
Contact Address
See the current Membership list and contact information at www.rcabc.org
Product Group - Standing Seam Metal Roof System
Panel Machine
New Tech Machinery
Panel Name
SS 100
Seam Type
Mechanical Lock (Seam Lock)

The roofing assembly / material information published below and in the RCABC Roofing Practices Manual DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer.

OVERVIEW

The New Tech Machinery Panel Machine is an on-site continuous metal roofing panel roll forming machine. This machine produces Seam Lock - SS 150 with a seam height of 38 mm (1-1/2") and Seam Lock - SS 100 with a seam height of 25 mm (1"). Both panel profiles vary from 300 mm (12") to 500 mm (20") wide.

On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').

SYSTEM DESCRIPTION

  1. General: Standing seam panels use a hidden fastening clip system for mechanical fastening to a solid substrate. The maximum spacing of the clips is 600 mm (24") on centre. The panels are locked together, with the clips as part of the seam, by use of a mechanical seamer.
  2. Range of application: on wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
  3. Fasteners (Screws): Fasteners used to attach panel clips to plywood to be No. 10-12 by 25 mm (1") long pancake head, No. 2 Phillips drive, A-point, coated steel screw. Minimum two fasteners per clip to be used.
  4. Panel Clips: One piece assembly 43.75 mm (1-3/4") wide, 31 mm (1-1/4") high. Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced 600 mm (24") on centre fastened to plywood deck. Englert "Series 1000 Interlocking Clip".
  5. Deck Requirements: in keeping with the Standard for Architectural Sheet Metal (ASM) Systems.

PROFILE

N/A

TECHNICAL DATA SHEET

N/A

SITE CONDITIONS

  1. Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").

PERFORMANCE REQUIREMENTS

  1. Wind Uplift Resistance: Panel securement shall conform to the requirements in Part 3 of the Standard for Architectural Sheet Metal (ASM) Systems.
  2. Materials:RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in Section 9.2. of the Standard.


Back to Site-Formed Metal Roofing Systems

Back to Accepted Materials


Home