Difference between revisions of "Materials:(Metro) SS 150"

Jump to: navigation, search

Difference between revisions of "Materials:(Metro) SS 150"

(PERFORMANCE REQUIREMENTS)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Manufacturer: <b>METRO ROOFING & SHEET METAL LTD.</b>  
+
__NOTOC__
 +
__NONUMBEREDHEADINGS__
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
  
Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']
+
<big><big>Division C - Accepted Materials</big></big>
 +
<hr>
 +
<big><big><big><big><big>SS 150</big></big></big></big></big><br>
 +
<big><big><big>by Metro Roofing & Sheet Metal Ltd.</big></big></big><br>
 +
{| class="wikitable"
 +
|-
 +
| style="background-color: #ffffcc; column-width:100%" | The metal panel listed and described below is accepted for use in the '''''RoofStar Guarantee Program'''''.
 +
|}
 +
{| class="wikitable"
 +
|-
 +
|
 +
;'''Manufacturer''': Metro Roofing & Sheet Metal Ltd.
 +
;'''Contact Address''': See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ www.rcabc.org]
 +
;'''Product Group - Standing Seam Metal Roof System'''
 +
;'''Panel Machine''': New Tech Machinery
 +
;'''Panel Name''': SS 100
 +
;'''Seam Type''': Mechanical Lock (''Seam Lock'')
  
Product Group: <b>STANDING SEAM METAL ROOF SYSTEM &#8211; SS150 PANEL AND SS100 PANEL</b>
+
The roofing assembly / material information published below and in the [http://{{SERVERNAME}}/index.php?title=Main_Page RCABC Roofing Practices Manual] DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority.  For more information about this product or system, consult the manufacturer.
 +
|}
  
;DESCRIPTION
+
====OVERVIEW====
 
+
The New Tech Machinery Panel Machine is an on-site continuous metal roofing panel roll forming machine. This machine produces ''Seam Lock - SS 150'' with a seam height of 38 mm (1-1/2") and ''Seam Lock - SS 100'' with a seam height of 25 mm (1"). Both panel profiles vary from 300 mm (12") to 500 mm (20") wide.
The New Tech Machinery Panel Machine is an on-site continuous metal roofing panel roll forming machine. This machine produces Seam Lock &#8211; SS 150 with a seam height of 38 mm (1-1/2") and Seam Lock &#8211; SS 100 with a seam height of 25 mm (1"). Both panel profiles vary from 300 mm (12") to 500 mm (20") wide.
 
  
 
On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').
 
On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').
 +
====SYSTEM DESCRIPTION====
 +
#'''General''': Standing seam panels use a hidden fastening clip system for mechanical fastening to a solid substrate. The maximum spacing of the clips is 600 mm (24") on centre. The panels are locked together, with the clips as part of the seam, by use of a mechanical seamer.
 +
#'''Range of application''': on wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
 +
#'''Fasteners (Screws)''': Fasteners used to attach panel clips to plywood to be No. 10-12 by 25 mm (1") long pancake head, No. 2 Phillips drive, A-point, coated steel screw. Minimum two fasteners per clip to be used.
 +
#'''Panel Clips''': One piece assembly 43.75 mm (1-3/4") wide, 31 mm (1-1/4") high. Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced 600 mm (24") on centre fastened to plywood deck. <i>Englert</i> "Series 1000 Interlocking Clip".
 +
#'''Deck Requirements''': in keeping with the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].
  
;1.1 <u>GENERAL</u>
+
====PROFILE====
 
+
N/A
:The roofing assembly / material information published in the <b>RCABC <i>Roofing Practices Manual</i></b> DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority.
 
 
 
;1.2 <u>SYSTEM DESCRIPTION</u>
 
 
 
:.1 Standing seam panels use a hidden fastening clip system for mechanical fastening to a solid substrate. The maximum spacing of the clips is 600 mm (24") on centre. The panels are locked together, with the clips as part of the seam, by use of a mechanical seamer.
 
 
 
:.2 Range of application: on wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
 
 
 
:.3 <b>Panel Attachment:</b>
 
 
 
:;Fasteners (Screws)
 
::Fasteners used to attach panel clips to plywood to be No. 10-12 by 25 mm (1") long pancake head, No. 2 Phillips drive, A-point, coated steel screw. Minimum two fasteners per clip to be used.
 
 
 
:;Roof Deck Fasteners (Panel Clips)
 
::One piece assembly 43.75 mm (1-3/4") wide, 31 mm (1-1/4") high. Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced 600 mm (24") on centre fastened to plywood deck. <i>Englert</i> &#8220;Series 1000 Interlocking Clip&#8221;.
 
  
1.3 <u>SITE CONDITIONS</u>
+
====TECHNICAL DATA SHEET====
:.1 Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").
+
N/A
  
;1.4 <u>PERFORMANCE REQUIREMENTS</u>
+
====SITE CONDITIONS====
 +
#Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").
  
:#'''Wind Uplift Standards''': Engineered designs to resist wind uplift may refer to the British Columbia Building Code, Div. B, Appendix C, Table C-2 which lists various types of loads, including wind loads, for specific reference locations throughout the province. See also [http://{{SERVERNAME}}/index.php?title=ASM_Application_Guides_and_Notes Guides and Notes (Wind Resistance)] for a simplified calculation procedure. Regardless of the resources indicated here, the Design Authority is responsible to perform accurate wind load calculations and specify securement requirements.
+
====PERFORMANCE REQUIREMENTS====
:#'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the standards published in the [http://rpm.rcabc.org/index.php/RoofStar_Guarantee_Standards_for_ASM_Roof_Assemblies Architectural Sheet Metal (ASM) Roof Standards].
+
<ol>
 +
<li>'''Wind Uplift Resistance''': Panel securement shall conform to the requirements in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#PART_3 Part 3] of the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].
 +
<li>'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#Section_9.2._Materials Section 9.2.] of the Standard.
 +
</li></ol>
  
 
<hr>
 
<hr>

Latest revision as of 17:24, 26 October 2023



Division C - Accepted Materials


SS 150
by Metro Roofing & Sheet Metal Ltd.

The metal panel listed and described below is accepted for use in the RoofStar Guarantee Program.
Manufacturer
Metro Roofing & Sheet Metal Ltd.
Contact Address
See the current Membership list and contact information at www.rcabc.org
Product Group - Standing Seam Metal Roof System
Panel Machine
New Tech Machinery
Panel Name
SS 100
Seam Type
Mechanical Lock (Seam Lock)

The roofing assembly / material information published below and in the RCABC Roofing Practices Manual DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer.

OVERVIEW

The New Tech Machinery Panel Machine is an on-site continuous metal roofing panel roll forming machine. This machine produces Seam Lock - SS 150 with a seam height of 38 mm (1-1/2") and Seam Lock - SS 100 with a seam height of 25 mm (1"). Both panel profiles vary from 300 mm (12") to 500 mm (20") wide.

On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').

SYSTEM DESCRIPTION

  1. General: Standing seam panels use a hidden fastening clip system for mechanical fastening to a solid substrate. The maximum spacing of the clips is 600 mm (24") on centre. The panels are locked together, with the clips as part of the seam, by use of a mechanical seamer.
  2. Range of application: on wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; for re-roofing or new construction.
  3. Fasteners (Screws): Fasteners used to attach panel clips to plywood to be No. 10-12 by 25 mm (1") long pancake head, No. 2 Phillips drive, A-point, coated steel screw. Minimum two fasteners per clip to be used.
  4. Panel Clips: One piece assembly 43.75 mm (1-3/4") wide, 31 mm (1-1/4") high. Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced 600 mm (24") on centre fastened to plywood deck. Englert "Series 1000 Interlocking Clip".
  5. Deck Requirements: in keeping with the Standard for Architectural Sheet Metal (ASM) Systems.

PROFILE

N/A

TECHNICAL DATA SHEET

N/A

SITE CONDITIONS

  1. Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").

PERFORMANCE REQUIREMENTS

  1. Wind Uplift Resistance: Panel securement shall conform to the requirements in Part 3 of the Standard for Architectural Sheet Metal (ASM) Systems.
  2. Materials:RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in Section 9.2. of the Standard.


Back to Site-Formed Metal Roofing Systems

Back to Accepted Materials


Home