Search results

Jump to: navigation, search

Search results

  • ...rane is the key component used in Johns Manville roofing and waterproofing systems. The membrane is applied in large sheets to reduce field seams. Exceptional ...fing Systems, Ballasted Roofing Systems; and Mechanically Fastened Roofing Systems.
    20 KB (3,027 words) - 23:04, 7 November 2016
  • The main component of the roofing and waterproofing systems is the Sarnafil Membrane, a tough flexible polyvinyl chloride (PVC) sheet, ...-laid roofing membrane under gravel ballast and in protected membrane roof systems.
    42 KB (6,360 words) - 18:54, 9 November 2016
  • Product Group: <b>POLYVINYL CHLORIDE WATERPROOFING MEMBRANES</b> The main component of the waterproofing systems is the Sarnafil Membrane, a tough flexible polyvinyl chloride (PVC) sheet,
    22 KB (3,157 words) - 18:55, 9 November 2016
  • ...s are mopped applied or mechanically fastened to the prepared substrate or insulation. ...oratories: Class A, B and C Flame Resistance, &#8220;Roofing Materials and Systems Directory&#8221;, 2001 Edition.
    36 KB (5,546 words) - 18:22, 8 November 2016
  • PROJECT NO. (OPTIONAL) Modified Bituminous Sheet Waterproofing ...tion for two ply SBS modified bituminous membranes in a protected membrane waterproofing system.
    23 KB (2,972 words) - 19:49, 9 November 2016
  • ...nts for polyvinyl chloride (PVC) waterproofing in protected membrane (PMR) systems. ::.2 RGC Guarantee Standards [E Waterproofing].
    18 KB (2,262 words) - 19:50, 9 November 2016
  • ...for Butyl (IIR) Sheet Membrane waterproofing in a protected membrane (PMR) systems. ::.2 RGC Guarantee Standards [E Waterproofing].
    19 KB (2,419 words) - 19:52, 9 November 2016
  • APPLIED RUBBERIZED ASPHALT WATERPROOFING ...lied rubberized asphalt (HARA) waterproofing in a protected membrane (PMR) systems.
    18 KB (2,332 words) - 19:53, 9 November 2016
  • <big>Guide Specification - Membrane Moisture Survey Systems</big> Refer to the following Membrane Moisture Survey Systems for the manufacturer's individual proprietary guide specifications when dev
    12 KB (1,634 words) - 22:57, 9 November 2016
  • <big>Guide Specification - Membrane Moisture Survey Systems</big> Refer to the following Membrane Moisture Survey Systems for the manufacturer's individual proprietary guide specifications when dev
    12 KB (1,693 words) - 22:58, 9 November 2016
  • :[[File:SBS Systems page thumb.JPG | link=http://rpm.rcabc.org/images/6/62/SBS_Systems_page_thu ...ems_(revised)<big>{{hilite | '''Standard for SBS-Modified Bitumen Membrane Systems'''</big> || 2020-October-21 }}]
    3 KB (424 words) - 13:52, 27 August 2021
  • === [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCVAPOUR|Air and Vapour Control]] === ...bc.org/index.php?title=Low_Slope_Membrane_Roofs '''Low Slope Membrane Roof Systems''']. This cross-reference is listed for information only.
    5 KB (611 words) - 20:30, 26 July 2021
  • <big><big><big><big><big>Notes to Standard for Asphalt Shingle Roof Systems</big></big></big></big></big> :<big>'''A-1.1.3.1.'''</big> ('''Permitted Roof Systems''')
    27 KB (3,999 words) - 15:35, 14 November 2023
  • <big><big><big><big><big>Notes to Standard for EPDM Membrane Roof Systems</big></big></big></big></big> :<big>'''A-1.1.3.1.'''</big> ('''Permitted Roof Systems''')
    59 KB (8,538 words) - 18:07, 2 April 2024
  • <big><big><big><big><big>Standard for Grade-level Waterproofing Systems</big></big></big></big></big> =ABOUT WATERPROOFING=
    117 KB (13,068 words) - 18:35, 5 April 2024
  • ...><big><big><big>Notes to Standard for Architectural Sheet Metal (ASM) Roof Systems</big></big></big></big></big> :<big>'''A-1.1.3.1.'''</big> ('''Permitted Roof Systems''')
    32 KB (4,655 words) - 13:53, 9 April 2024
  • <big><big>'''Waterproofing Roofs'''</big></big> ====Insulation====
    7 KB (897 words) - 18:41, 8 June 2023
  • <big><big><big><big><big>Notes to Standard for TPO Membrane Roof Systems</big></big></big></big></big> :<big>'''A-1.1.3.1.'''</big> ('''Permitted Roof Systems''')
    57 KB (8,227 words) - 18:02, 2 April 2024
  • <big><big><big><big><big>Notes to Standard for PVC Membrane Roof Systems</big></big></big></big></big> :<big>'''A-1.1.3.1.'''</big> ('''Permitted Roof Systems''')
    57 KB (8,227 words) - 18:07, 2 April 2024
  • ...><big><big><big>Notes to Standard for Architectural Sheet Metal (ASM) Roof Systems</big></big></big></big></big> :<big>'''A-1.1.3.1.'''</big> ('''Permitted Roof Systems''')
    31 KB (4,535 words) - 15:47, 27 October 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)