Difference between revisions of "Division C - Search by System (under revision)"

Jump to: navigation, search

Difference between revisions of "Division C - Search by System (under revision)"

Line 40: Line 40:
 
<big>'''Division B: Standards'''</big>
 
<big>'''Division B: Standards'''</big>
 
:'''Standards for Roof Waterproofing Systems'''
 
:'''Standards for Roof Waterproofing Systems'''
:[http://rpm.rcabc.org/index.php?title=Draft_Revisions_to_Standard_layout <i class="fa fa-star" aria-hidden="true"></i> {{hilite | SBS-Modified Bitumen Membrane Systems || 2021-February-7 }}]
+
:[http://rpm.rcabc.org/index.php?title=Mock-up_of_Standard_for_SBS-Modified_Bitumen_Membrane_Systems_(revised) <i class="fa fa-star" aria-hidden="true"></i> {{hilite | SBS-Modified Bitumen Membrane Systems || 2021-February-7 }}]
 
:[http://{{SERVERNAME}}/index.php?title=Standard_for_EPDM_Membrane_Systems <i class="fa fa-star" aria-hidden="true"></i> {{hilite | EPDM Membrane Systems || 2021-February-7 }}]
 
:[http://{{SERVERNAME}}/index.php?title=Standard_for_EPDM_Membrane_Systems <i class="fa fa-star" aria-hidden="true"></i> {{hilite | EPDM Membrane Systems || 2021-February-7 }}]
 
:[http://{{SERVERNAME}}/index.php?title=Standard_for_TPO_Membrane_Systems <i class="fa fa-star" aria-hidden="true"></i> {{hilite | TPO Membrane Systems || 2021-February-7 }}]
 
:[http://{{SERVERNAME}}/index.php?title=Standard_for_TPO_Membrane_Systems <i class="fa fa-star" aria-hidden="true"></i> {{hilite | TPO Membrane Systems || 2021-February-7 }}]

Revision as of 18:04, 19 August 2021

Updates and Revisions

Last Update:
July 9, 2021


The Roofing Practices Manual is the official guide for RCABC Members, Accepted Observers, consultants, architects and specification writers designing or installing Waterproofing or Water-shedding systems, and describes the RoofStar Guarantee Standards, Guiding Principles and Recommended Practices necessary to qualify for a RoofStar Guarantee. The RPM meets or exceeds the current national and provincial standards for construction and wind uplift design resistance. See the Table of Contents below.

NOTICE to Readers:

This Manual is revised at least three times per calendar year. Yellow highlighted text indicates a change to the Manual within the past twelve months, and remains in effect for one full year (365 days). For a summary of each update catalogued since 2010, use the Technical Updates button below.


Wind Uplift design resources
See Part 3 in any of the membrane system Standards