Difference between revisions of "Division C - Search by System (under revision)"

Jump to: navigation, search

Difference between revisions of "Division C - Search by System (under revision)"

Line 108: Line 108:
 
</div>
 
</div>
 
<div class="col-md-5">
 
<div class="col-md-5">
<big>'''Last Update:<br>July 9, 2021'''</big>
+
<html><a class="btn btn-lg btn-neutral">Last Update: July 9, 2021</a></html>
 
</div>
 
</div>
 
<div class="col-md-12">
 
<div class="col-md-12">

Revision as of 20:40, 25 August 2021

Table of Contents

Preface

Division A: Scope, Use of Standards, and Guarantee

Scope and Use of RPM and Standards
Guarantee

Division B: Standards

Standards for Roof Waterproofing Systems
"SBS" Systems
EPDM Membrane Systems
TPO Membrane Systems
PVC Membrane Systems
"Hot Rubber" Systems (TBA)
PMMA Liquid Systems (TBA)
"BUR" Systems
Standards for Water-Shedding Systems
"ASM") Systems
Asphalt Shingle Systems
Cedar Systems
Tile & Slate Systems
Standards for Grade-level Waterproofing Systems
"SBS" Grade-level Waterproofing Systems
"Hot Rubber" Grade-level Waterproofing Systems
PVC Grade-level Waterproofing Systems

Division C: Accepted Materials

Search by Product Category
Search by Product Name
Search by Manufacturer
Search by System
Material Acceptance Criteria
Material Classification and Application for Acceptance

Division D: Construction Details

"SBS" Systems
EPDM Systems
TPO Systems
PVC Systems
"Hot Rubber" Systems
PMMA Liquid Systems
"BUR" Systems
"ASM" Systems
Asphalt Shingle Systems
Cedar Systems
Tile & Slate Systems
Grade-level Waterproofing Systems

Division E: General Information

Information Corner
Roof Maintenance
Conversion Tables and Charts
Metric and Standard Measurements (Symbols and Guidelines)
Additional Standards for Materials
Health & Safety
Glossary
Bibliography and References
Updates and Revisions

The Roofing Practices Manual (RPM) is the official repository of Standards necessary to qualify roof and grade-level waterproofing projects for a RoofStar Guarantee.

The RPM is revised at least three times per calendar year. Yellow highlighted text indicates a change to the Manual within the past twelve months, and remains in effect for one full year (365 days). For a summary of each update catalogued since 2010, use the Technical Updates button above.


click HERE for a brief tutorial of the Roofing Practices Manual
Wind Uplift design resources
Specified Wind Load
Calculators

Wind-RCI

Wind-VRA



Tested Assembly Report Library (CSA-A123.21)
AARS reports
PARS reports
MARS reports