Difference between revisions of "Division C - Search by System (under revision)"
Difference between revisions of "Division C - Search by System (under revision)"
Line 4: | Line 4: | ||
<div class="panel panel-danger"> | <div class="panel panel-danger"> | ||
<div class="panel-heading text-center"><big><big><big>RCABC '''Roofing Practices Manual''' ('''RPM''')</big></big></big><br><big>Official manual of the RoofStar Guarantee Program</big></div> | <div class="panel-heading text-center"><big><big><big>RCABC '''Roofing Practices Manual''' ('''RPM''')</big></big></big><br><big>Official manual of the RoofStar Guarantee Program</big></div> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</div> | </div> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> |
Revision as of 15:54, 26 August 2021
RCABC Roofing Practices Manual (RPM)
Official manual of the RoofStar Guarantee Program
Official manual of the RoofStar Guarantee Program
Table of Contents
Division A: Scope, Use of Standards, and Guarantee
Division B: Standards
- Standards for Roof Waterproofing Systems
- "SBS" Systems
- EPDM Systems
- TPO Systems
- PVC Systems
- "Hot Rubber" Systems (TBA)
- PMMA Liquid Systems (TBA)
- "BUR" Systems
- Standards for Water-Shedding Systems
- "ASM") Systems
- Asphalt Shingle Systems
- Cedar Systems
- Tile & Slate Systems
- Standards for Grade-level Waterproofing Systems
- "SBS" Systems (TBA)
- "Hot Rubber" Systems (TBA)
- PVC Systems (TBA)
Division C: Accepted Materials
Division D: Construction Details
- "SBS" Systems
- EPDM Systems
- TPO Systems
- PVC Systems
- "BUR" Systems
- "ASM" Systems
- Asphalt Shingle Systems
- Cedar Systems
- Tile & Slate Systems
- Grade-level Waterproofing Systems
Division E: General Information
Updates and Revisions
The Roofing Practices Manual (RPM) is the official repository of Standards necessary to qualify roof and grade-level waterproofing projects for a RoofStar Guarantee.
The RPM is revised at least three times per calendar year. Yellow highlighted text indicates a change to the Manual within the past twelve months, and remains in effect for one full year (365 days). For a summary of each update catalogued since 2010, use the Technical Updates button above.
- click HERE for a brief tutorial of the Roofing Practices Manual
Wind Uplift design resources
Specified Wind Load Calculators
Tested Assembly Report Library (CSA-A123.21)