Difference between revisions of "Division C - Search by System (under revision)"
Difference between revisions of "Division C - Search by System (under revision)"
Line 34: | Line 34: | ||
<big>[http://{{SERVERNAME}}/index.php?title=Preface '''Preface''']</big> | <big>[http://{{SERVERNAME}}/index.php?title=Preface '''Preface''']</big> | ||
− | <big>'''Division A: Scope, Use of Standards and Guarantee'''</big> | + | <big>'''Division A: Scope, Use of Standards, and Guarantee'''</big> |
:[http://{{SERVERNAME}}/index.php?title=Scope_and_Use_of_Standards Scope and Use of Standards] | :[http://{{SERVERNAME}}/index.php?title=Scope_and_Use_of_Standards Scope and Use of Standards] | ||
:[http://{{SERVERNAME}}/index.php?title=Guarantee Guarantee] | :[http://{{SERVERNAME}}/index.php?title=Guarantee Guarantee] |
Revision as of 21:19, 18 August 2021
Official manual of the RoofStar Guarantee Program
Division A: Scope, Use of Standards, and Guarantee
Division B: Standards
- Standards for Roof Waterproofing Systems
- SBS-Modified Bitumen Membrane Systems
- EPDM Membrane Systems
- TPO Membrane Systems
- PVC Membrane Systems
- Hot Fluid-applied Rubberized Asphalt Systems (TBA)
- PMMA Liquid Systems (TBA)
- Built-up Roof (BUR) Systems
- Standards for Water-Shedding Systems
- Architectural Sheet Metal (ASM) Systems
- Asphalt Shingle Systems
- Cedar Shake and Shingle Systems
- Tile & Slate Systems
- Standards for Grade-level Waterproofing Systems
- Standards for Grade-level Waterproofing Systems
- Notes to Standards
- click HERE for a brief tutorial of the Roofing Practices Manual
Last Update:
July 9, 2021
The Roofing Practices Manual is the official guide for RCABC Members, Accepted Observers, consultants, architects and specification writers designing or installing Waterproofing or Water-shedding systems, and describes the RoofStar Guarantee Standards, Guiding Principles and Recommended Practices necessary to qualify for a RoofStar Guarantee. The RPM meets or exceeds the current national and provincial standards for construction and wind uplift design resistance. See the Table of Contents below.
NOTICE to Readers:
This Manual is revised at least three times per calendar year. Yellow highlighted text indicates a change to the Manual within the past twelve months, and remains in effect for one full year (365 days). For a summary of each update catalogued since 2010, use the Technical Updates button below.
- See Part 3 in any of the membrane system Standards
Tested Assembly Report Library (CSA-A123.21) |
---|