Difference between revisions of "Materials:(Marine) MR-100"
Difference between revisions of "Materials:(Marine) MR-100"
(→PERFORMANCE REQUIREMENTS) |
|||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | __NOTOC__ | |
+ | __NONUMBEREDHEADINGS__ | ||
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
− | Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ | + | <big><big>Division C - Accepted Materials</big></big> |
+ | <hr> | ||
+ | <big><big><big><big><big>MR-100</big></big></big></big></big><br> | ||
+ | <big><big><big>by Marine Roofing (1996) Ltd.</big></big></big><br> | ||
+ | {| class="wikitable" | ||
+ | |- | ||
+ | | style="background-color: #ffffcc; column-width:100%" | The metal panel listed and described below is accepted for use in the '''''RoofStar Guarantee Program'''''. | ||
+ | |} | ||
+ | {| class="wikitable" | ||
+ | |- | ||
+ | | | ||
+ | ;'''Manufacturer''': Marine Roofing (1996) Ltd. | ||
+ | ;'''Contact Address''': See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ www.rcabc.org] | ||
+ | ;'''Product Group - Standing Seam Metal Roof System''' | ||
+ | ;'''Panel Machine''': New Tech Machinery | ||
+ | ;'''Panel Name''': MR-100 | ||
+ | ;'''Seam Type''': Nail Strip / Interlocking | ||
− | + | The roofing assembly / material information published below and in the [http://{{SERVERNAME}}/index.php?title=Main_Page RCABC Roofing Practices Manual] DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer. | |
− | + | |} | |
− | |||
+ | ====OVERVIEW==== | ||
The 1" MR-100 is a metal roof panel formed from 24 gauge. The panel can be applied onto solid sheeting with or without insulation. Width from 300 mm (12") to 500 mm (20") wide with a 25 mm (1") height at the male rib. | The 1" MR-100 is a metal roof panel formed from 24 gauge. The panel can be applied onto solid sheeting with or without insulation. Width from 300 mm (12") to 500 mm (20") wide with a 25 mm (1") height at the male rib. | ||
− | On-site | + | On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150'). |
− | + | ====SYSTEM DESCRIPTION==== | |
− | + | #'''General''': Metal panels employ a hidden fastening system for securement to a solid substrate. 1" MR-100 panels are produced with a nail strip to eliminate the use of clips and allow the panel seams to interlock without having to use a mechanical seaming device. | |
− | + | #'''Range of application''': on wood or metal sloped roofs, with or without exterior insulation; in commercial, institutional, industrial and residential construction; also used for roof replacement (retrofit) application. | |
− | + | #'''Fabrication''': | |
− | + | ##Unless otherwise shown on drawings or specified herein, fabricate panels in continuous one piece lengths and fabricate flashings and accessories in longest practical lengths. | |
− | + | ##Roofing panels shall be factory formed or site formed. | |
− | : | + | ##Verify prior to fabrication. |
− | + | ##If field measurements differ from drawing dimensions, notify Architect / Professional Engineer prior to fabrication. | |
− | :. | + | #'''Fasteners (Screws)''': <u>Fasteners(Screws)</u> - Fasteners used to attach panels to steel or wood substrate to be No. 10 - 16 pancake head, No. 2 Phillips drive, self-drilling, coated screw. |
− | + | #'''Delivery, Storage & Handling''': | |
− | + | ##Protect against damage and discoloration. | |
− | + | ##Handle panels with non-marring slings. | |
− | + | ##Do not bend panels. | |
− | + | ##Store panels above ground, with one end elevated for drainage. | |
− | + | ##Protect panels against standing water and condensation between adjacent surfaces. | |
− | + | ##If panels become wet, immediately separate sheets, wipe dry with clean cloth, allow to air dry. | |
− | + | ##Treat, or isolate with protective material, any contacting surfaces of dissimilar materials to prevent electrolytic corrosion. | |
− | + | #'''Deck Requirements''': in keeping with the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems]. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | : | ||
− | :. | ||
− | |||
− | + | ====PROFILE==== | |
− | + | N/A | |
− | |||
− | + | ====TECHNICAL DATA SHEET==== | |
− | + | N/A | |
− | + | ====SITE CONDITIONS==== | |
+ | #Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12"). | ||
+ | #Verify that structural deck to receive panels is complete, in true plane, secure and otherwise properly prepared. | ||
+ | #Prior to starting work, notify General Contractor about defects requiring correction. | ||
+ | #Do not start work until conditions are satisfactory. | ||
− | + | ====PERFORMANCE REQUIREMENTS==== | |
− | + | <ol> | |
+ | <li>'''Wind Uplift Resistance''': Panel securement shall conform to the requirements in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#PART_3 Part 3] of the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems]. | ||
+ | <li>'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#Section_9.2._Materials Section 9.2.] of the Standard. | ||
+ | </li></ol> | ||
<hr> | <hr> |
Latest revision as of 17:22, 26 October 2023
Division C - Accepted Materials
MR-100
by Marine Roofing (1996) Ltd.
The metal panel listed and described below is accepted for use in the RoofStar Guarantee Program. |
The roofing assembly / material information published below and in the RCABC Roofing Practices Manual DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer. |
OVERVIEW
The 1" MR-100 is a metal roof panel formed from 24 gauge. The panel can be applied onto solid sheeting with or without insulation. Width from 300 mm (12") to 500 mm (20") wide with a 25 mm (1") height at the male rib.
On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to nominal 46 m (150').
SYSTEM DESCRIPTION
- General: Metal panels employ a hidden fastening system for securement to a solid substrate. 1" MR-100 panels are produced with a nail strip to eliminate the use of clips and allow the panel seams to interlock without having to use a mechanical seaming device.
- Range of application: on wood or metal sloped roofs, with or without exterior insulation; in commercial, institutional, industrial and residential construction; also used for roof replacement (retrofit) application.
- Fabrication:
- Unless otherwise shown on drawings or specified herein, fabricate panels in continuous one piece lengths and fabricate flashings and accessories in longest practical lengths.
- Roofing panels shall be factory formed or site formed.
- Verify prior to fabrication.
- If field measurements differ from drawing dimensions, notify Architect / Professional Engineer prior to fabrication.
- Fasteners (Screws): Fasteners(Screws) - Fasteners used to attach panels to steel or wood substrate to be No. 10 - 16 pancake head, No. 2 Phillips drive, self-drilling, coated screw.
- Delivery, Storage & Handling:
- Protect against damage and discoloration.
- Handle panels with non-marring slings.
- Do not bend panels.
- Store panels above ground, with one end elevated for drainage.
- Protect panels against standing water and condensation between adjacent surfaces.
- If panels become wet, immediately separate sheets, wipe dry with clean cloth, allow to air dry.
- Treat, or isolate with protective material, any contacting surfaces of dissimilar materials to prevent electrolytic corrosion.
- Deck Requirements: in keeping with the Standard for Architectural Sheet Metal (ASM) Systems.
PROFILE
N/A
TECHNICAL DATA SHEET
N/A
SITE CONDITIONS
- Minimum roof slope is 1:4 (3" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").
- Verify that structural deck to receive panels is complete, in true plane, secure and otherwise properly prepared.
- Prior to starting work, notify General Contractor about defects requiring correction.
- Do not start work until conditions are satisfactory.
PERFORMANCE REQUIREMENTS
- Wind Uplift Resistance: Panel securement shall conform to the requirements in Part 3 of the Standard for Architectural Sheet Metal (ASM) Systems.
- Materials:RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in Section 9.2. of the Standard.