Difference between revisions of "SBS Roof System Details"
Difference between revisions of "SBS Roof System Details"
(→11 DRAINS and PENETRATIONS) |
(→11 DRAINS and PENETRATIONS) |
||
Line 84: | Line 84: | ||
:[[SBS 11.3.3.2-4 Curbs and Sleepers (multiple penetrations)| SBS 11.3.3.2-4 Curbs and Sleepers (multiple penetrations)]] | :[[SBS 11.3.3.2-4 Curbs and Sleepers (multiple penetrations)| SBS 11.3.3.2-4 Curbs and Sleepers (multiple penetrations)]] | ||
− | :[[SBS | + | :[[SBS 11.3.3.3-1 Penetration Flashings (plumbing vent)| SBS 11.3.3.3-1 Penetration Flashings (plumbing vent)]] |
− | :[[SBS | + | :[[SBS 11.3.3.3-2 Penetration Flashings (two-part cable)| SBS 11.3.3.3-2 Penetration Flashings (two-part cable)]] |
− | :[[SBS | + | :[[SBS 11.3.3.4 Sealant Pocket| SBS 11.3.3.4 Sealant Pocket]] |
− | :[[SBS | + | :[[SBS 11.3.4 Guardrails | SBS 11.3.4 Guardrails]] |
− | :[[SBS | + | :[[SBS 11.3.5-1 Roof Anchors (typical) | SBS 11.3.5-1 Roof Anchors (typical)]] |
− | :[[SBS | + | :[[SBS 11.3.5-2 Roof Anchors (conventional system) | SBS 11.3.5-2 Roof Anchors (conventional system)]] |
− | :[[SBS | + | :[[SBS 11.3.5-3 Roof Anchors (PMRA) | SBS 11.3.5-3 Roof Anchors (PMRA)]] |
====PROTECTED MEMBRANES and OTHER DETAILS==== | ====PROTECTED MEMBRANES and OTHER DETAILS==== |
Revision as of 19:38, 5 December 2019
Editor's note |
---|
This page is currently under revision, as the details are renumbered and new details and printable detail pages are added. Continue to watch for further updates to the this page and the displayed links. |
- The drawings linked on this page are intended to represent a variety of SBS-modified Bitumen Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturers’ specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about SBS-modified Bitumen Membrane System designs and requirements, see SBS Modified Bitumen Membrane Systems.
NOTE: 'PDF' shown after a file name below indicates a downloadable print sheet is available for Construction Details. Click on the detail link and look for the icon.
1 GENERAL
- SBS 1.3.1-1 Conventionally Insulated System (typical)
- SBS 1.3.1-3 Protected Membrane Roof Assembly (typical)
2 SUPPORTING STRUCTURES: Decks and Walls
3 SECURING the ROOF ASSEMBLY
4 MATERIALS
5 DECK and WALL OVERLAYS
6 AIR and VAPOUR CONTROLS
7 INSULATION
8 INSULATION OVERLAYS
9 FIELD MEMBRANE
10 PERIMETERS and WALLS
- SBS 10.3.1-1 Perimeter Membrane Termination (typical)
- SBS 10.3.1-2 Perimeter Membrane Termination (expansion joint)
- SBS 10.3.1-3 Perimeter Membrane Termination (stucco wall, replacement roofing)
- SBS 10.3.1-4 Perimeter Membrane Termination (double surface reglet)
11 11 DRAINS and PENETRATIONS
- SBS 11.3.2.5-1 Scuppers and Overflows (open wall scupper)
- SBS 11.3.2.5-1 Scuppers and Overflows (through-wall scupper)
- SBS 11.3.3.2-1 Curbs and Sleepers (basic curb)
- SBS 11.3.3.2-2 Curbs and Sleepers (equipment sleeper)
- SBS 11.3.3.2-3 Curbs and Sleepers (mechanical opening)
- SBS 11.3.3.2-4 Curbs and Sleepers (multiple penetrations)
- SBS 11.3.3.3-1 Penetration Flashings (plumbing vent)
- SBS 11.3.3.3-2 Penetration Flashings (two-part cable)
- SBS 11.3.5-1 Roof Anchors (typical)
- SBS 11.3.5-2 Roof Anchors (conventional system)
- SBS 11.3.5-3 Roof Anchors (PMRA)