Difference between revisions of "SBS Roof System Details"

Jump to: navigation, search

Difference between revisions of "SBS Roof System Details"

Line 1: Line 1:
 
{{Template:RPM Info}}
 
{{Template:RPM Info}}
__NONUMBEREDHEADINGS__
 
 
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 
__NOTOC__
 
__NOTOC__
Line 23: Line 22:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<hr>
 
<hr>
====Part 1 - General====
+
====GENERAL====
:'''Permitted Roof Systems''' ([[Model_SBS_Standard_(2022)#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])
+
:[[SBS 1.3.1-1 Conventionally Insulated System (typical) | {{hilite | SBS 1.3.1-1 Conventionally Insulated System (typical)|| 2021-February-7 }}]]
:[[SBS 1.1.3.-1 Conventionally Insulated System (typical) | {{hilite | Conventionally Insulated System (typical)|| 2021-February-7 }}]]
+
:[[SBS 1.3.1-2 Conventionally Insulated System (alternate) | {{hilite | SBS 1.3.1-2 Conventionally Insulated System (alternate)|| 2021-February-7 }}]]
:[[SBS 1.1.3.-2 Conventionally Insulated System (alternate) | {{hilite | Conventionally Insulated System (alternate)|| 2021-February-7 }}]]
+
:[[SBS 1.3.1-3 Protected Membrane Roof Assembly (typical) | {{hilite | SBS 1.3.1-3 Protected Membrane Roof Assembly (typical)|| 2021-February-7 }}]]
:[[SBS 1.1.3.-3 Protected Membrane Roof (typical) | {{hilite | Protected Membrane Roof (typical)|| 2021-February-7 }}]]
 
  
====Part 6 - Air and Vapour Controls====
+
====SUPPORTING STRUCTURES: Decks and Walls====
  
:'''Continuity and Support''' ([[Model_SBS_Standard_(2022)#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])
+
====SECURING the ROOF ASSEMBLY====
:[[SBS 6.3.2.-1 Air and Vapour Controls (field)| {{hilite | SBS 6.3.2.1.-1 Air and Vapour Controls (field)|| 2021-February-7 }}]]
 
  
====Part 10 - Perimeters and Walls====
+
====MATERIALS====
  
:'''General Application''' ([[Model_SBS_Standard_(2022)#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])
+
====DECK and WALL OVERLAYS====
:[[SBS 10.3.2.-1 Perimeter Membrane Termination (typical) | Perimeter Membrane Termination (typical)]]
 
:[[SBS 10.3.1-3 Perimeter Membrane Termination (stucco wall, replacement roofing) | Stucco Wall (replacement roofing)]]
 
:[[SBS 10.3.1-4 Perimeter Membrane Termination (double surface reglet)| Double Surface Reglet]]
 
  
:'''Parapets''' ([[Model_SBS_Standard_(2022)#10.3.4.1._Parapets | Article 10.3.4.1.]])
+
====AIR and VAPOUR CONTROLS====
:[[SBS 10.3.5.1-1 Parapet (typical)| Parapet (typical)]]
+
:[[SBS 6.3.1 Air and Vapour Controls (field) | {{hilite | SBS 6.3.1 Air and Vapour Controls (field)|| 2021-February-7 }}]]
:[[SBS 10.3.5.1-2 Parapet (independent of roof structure)(typical) | Parapet (independent of roof structure)(typical)]]
 
:[[SBS 10.3.5.1-3 Parapet, tall (typical) | Parapet, tall (typical)]]
 
:[[SBS 10.3.5.1-4 Parapet (wall tie-in) | Parapet (wall tie-in)]]
 
  
:'''Low-profile Edges''' ([[Model_SBS_Standard_(2022)#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])
+
====INSULATION====
:[[SBS 10.3.5.2 Metal Edge Termination | {{hilite | Metal Edge Termination|| 2021-February-7 }}]]
 
:[[SBS 10.3.5.3 Canted Edge | {{hilite | Canted Edge|| 2021-February-7 }}]]
 
  
:'''Fire Separation Walls''' ([[Model_SBS_Standard_(2022)#10.3.4.4._Fire_Separation_Walls | Article 10.3.4.4.]])
+
====INSULATION OVERLAYS====
:[[SBS 10.3.9-1 Roof-Wall Transitions (fire separation joint)| SBS 10.3.4.4.-1 Fire Separation Joint]]
 
:[[SBS 10.3.9-2 Roof-Wall Transitions (fire separation wall)| SBS 10.3.4.4.-2 Fire Separation Wall]]
 
  
:'''Doors, Windows, and Wall Openings''' ([[Model_SBS_Standard_(2022)#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])
+
====FIELD MEMBRANE====
:[[SBS 10.3.7.1 Low Door Opening | {{hilite | Low Door Opening || 2022-February-5 }}]]
 
:[[SBS 10.3.7.2 Window Curb | Window Opening]]
 
  
:'''Expansion Joints''' ([[Model_SBS_Standard_(2022)#10.3.6.1._Expansion_Joints | Article 10.3.6.1.]])
+
====PERIMETERS and WALLS====
:[[SBS 10.3.1-2 Perimeter Membrane Termination (expansion joint) | Expansion Joint (at wall)]]
+
:[[SBS 10.3.1-1 Perimeter Membrane Termination (typical) | SBS 10.3.1-1 Perimeter Membrane Termination (typical)]]
:[[SBS 10.3.6.1 Expansion Joint| Expansion Joint (in field)]]
+
:[[SBS 10.3.1-2 Perimeter Membrane Termination (expansion joint) | SBS 10.3.1-2 Perimeter Membrane Termination (expansion joint)]]  
 +
:[[SBS 10.3.1-3 Perimeter Membrane Termination (stucco wall, replacement roofing) | SBS 10.3.1-3 Perimeter Membrane Termination (stucco wall, replacement roofing)]]
 +
:[[SBS 10.3.1-4 Perimeter Membrane Termination (double surface reglet)| SBS 10.3.1-4 Perimeter Membrane Termination (double surface reglet)]]
  
:'''Control Joints (Roof Dividers)''' ([[Model_SBS_Standard_(2022)#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])
+
:[[SBS 10.3.5.1-1 Parapet (typical)| SBS 10.3.5.1-1 Parapet (typical)]]
:[[SBS 10.3.6.2 Control Joint (Roof Divider)| Control Joint (typical)]]
+
:[[SBS 10.3.5.1-2 Parapet (independent of roof structure)(typical) | SBS 10.3.5.1-2 Parapet (independent of roof structure)(typical)]]
 +
:[[SBS 10.3.5.1-3 Parapet, tall (typical) | SBS 10.3.5.1-3 Parapet, tall (typical)]]
 +
:[[SBS 10.3.5.1-4 Parapet (wall tie-in) | SBS 10.3.5.1-4 Parapet (wall tie-in)]]
 +
 
 +
:[[SBS 10.3.5.2 Metal Edge Termination | {{hilite | SBS 10.3.5.2 Metal Edge Termination|| 2021-February-7 }}]]
 +
:[[SBS 10.3.5.3 Canted Edge | {{hilite | SBS 10.3.5.3 Canted Edge|| 2021-February-7 }}]]
 +
 
 +
:[[SBS 10.3.6.1 Expansion Joint| SBS 10.3.6.1 Expansion Joint]]
 +
:[[SBS 10.3.6.2 Control Joint (Roof Divider)| SBS 10.3.6.2 Control Joint (Roof Divider)]]
 +
 
 +
:[[SBS 10.3.7.1 Low Door Opening | {{hilite | SBS 10.3.7.1 Low Door Opening || 2022-February-5 }}]]
 +
:[[SBS 10.3.7.2 Window Curb | SBS 10.3.7.2 Window Curb]]
 +
 
 +
:[[SBS 10.3.9-1 Roof-Wall Transitions (fire separation joint)| SBS 10.3.9-1 Roof-Wall Transitions (fire separation joint)]]
 +
:[[SBS 10.3.9-2 Roof-Wall Transitions (fire separation wall)| SBS 10.3.9-2 Roof-Wall Transitions (fire separation wall)]]
  
 
</div>
 
</div>
Line 70: Line 71:
 
<hr>
 
<hr>
  
====Part 11 - Drainage====
+
====11 DRAINS and PENETRATIONS====
:'''General Requirements for Cast-iron Roof Drains''' ([[Model_SBS_Standard_(2022)#11.3.3.2._General_Requirements_for_Cast-iron_Roof_Drains | Article 11.3.3.2.]])
+
:[[SBS 11.3.2.2-1 Cast Iron Drains| SBS 11.3.2.2-1 Cast Iron Drains]]
:[[SBS 11.3.2.2-1 Cast Iron Drains| Cast Iron Drains]]
 
  
:Flanged Insert-type Roof Drains ([[Model_SBS_Standard_(2022)#11.3.3.6._Flanged_Insert-type_Roof_Drains | Article 11.3.3.6.]])
+
:[[SBS 11.3.2.4-1 Flange-style Drains (typical)| SBS 11.3.2.4-1 Flange-style Drains (typical)]]
:[[SBS 11.3.2.4-1 Flange-style Drains (typical)| Flanged Drains (typical)]]
+
:[[SBS 11.3.2.4-2 Flange-style Drains (clamping)| SBS 11.3.2.4-2 Flange-style Drains (clamping)]]
:[[SBS 11.3.2.4-2 Flange-style Drains (clamping)| Flanged Drains (clamping)]]
 
  
:'''Scuppers and Overflows''' ([[Model_SBS_Standard_(2022)#11.3.3.7._Scuppers_and_Overflows | Article 11.3.3.7.]])
+
:[[SBS 11.3.2.5-1 Scuppers and Overflows (open wall scupper)| SBS 11.3.2.5-1 Scuppers and Overflows (open wall scupper)]]
:[[SBS 11.3.2.5-1 Scuppers and Overflows (open wall scupper)| Open Wall Scupper]]
+
:[[SBS 11.3.2.5-2 Scuppers and Overflows (through-wall scupper)| SBS 11.3.2.5-2 Scuppers and Overflows (through-wall scupper)]]
:[[SBS 11.3.2.5-2 Scuppers and Overflows (through-wall scupper)| Through-wall Scupper]]
 
  
====Part 12 - Penetrations and Curbs====
+
:[[SBS 11.3.3.2-1 Curbs and Sleepers (basic curb)| {{hilite | SBS 11.3.3.2-1 Curbs and Sleepers (basic curb)|| 2021-February-7 }}]]
 +
:[[SBS 11.3.3.2-2 Curbs and Sleepers (equipment sleeper)| SBS 11.3.3.2-2 Curbs and Sleepers (equipment sleeper)]]
 +
:[[SBS 11.3.3.2-3 Curbs and Sleepers (mechanical opening)| SBS 11.3.3.2-3 Curbs and Sleepers (mechanical opening)]]
 +
:[[SBS 11.3.3.2-4 Curbs and Sleepers (multiple penetrations)| SBS 11.3.3.2-4 Curbs and Sleepers (multiple penetrations)]]
  
:'''General Requirements for Flashing Penetrations''' ([[Model_SBS_Standard_(2022)#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])
+
:[[SBS 11.3.3.3-1 Penetration Flashings (plumbing vent)| SBS 11.3.3.3-1 Penetration Flashings (plumbing vent)]]
:[[SBS 11.3.3.3-1 Penetration Flashings (plumbing vent)| Plumbing Vent]]
+
:[[SBS 11.3.3.3-2 Penetration Flashings  (two-part cable)| {{hilite | SBS 11.3.3.3-2 Penetration Flashings  (two-part cable)|| 2021-February-7 }}]]
:[[SBS 11.3.3.3-2 Penetration Flashings  (two-part cable)| {{hilite | Two-part Cable Flashing|| 2021-February-7 }}]]
 
:[[SBS 11.3.3.2-4 Curbs and Sleepers (multiple penetrations)| Multiple Penetration Flashing]]
 
:[[SBS 11.3.5-1 Roof Anchors (typical) | Roof Anchors (typical)]]
 
:[[SBS 11.3.5-2 Roof Anchors (conventional system) | Roof Anchors (conventional system)]]
 
:[[SBS 11.3.5-3 Roof Anchors (PMRA) | Roof Anchors (PMRA)]]
 
  
:'''Curbs, Sleepers, and Equipment Pads''' ([[Model_SBS_Standard_(2022)#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])
+
:[[SBS 11.3.3.4 Sealant Pocket| SBS 11.3.3.4 Sealant Pocket]]
:[[SBS 11.3.3.2-1 Curbs and Sleepers (basic curb)| {{hilite | Uninsulated Curb|| 2021-February-7 }}]]
 
:[[SBS 11.3.3.2-3 Curbs and Sleepers (mechanical opening)| Insulated Curb (Mechanical)]]
 
:[[SBS 11.3.3.2-2 Curbs and Sleepers (equipment sleeper)| Equipment Sleeper]]
 
  
:'''Railings, Ladders, and Other Attached Structures''' ([[Model_SBS_Standard_(2022)#12.3.2.7._Railings.2C_Ladders.2C_and_Other_Attached_Structures | Article 12.3.2.7.]])
+
:[[SBS 11.3.4 Guardrails | SBS 11.3.4 Guardrails]]
:[[SBS 11.3.4 Guardrails | Railing]]
 
  
:'''Sealant Pockets''' ([[Model_SBS_Standard_(2022)#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])
+
:[[SBS 11.3.5-1 Roof Anchors (typical) | SBS 11.3.5-1 Roof Anchors (typical)]]
:[[SBS 11.3.3.4 Sealant Pocket| Sealant Pocket (typical)]]
+
:[[SBS 11.3.5-2 Roof Anchors (conventional system) | SBS 11.3.5-2 Roof Anchors (conventional system)]]
 +
:[[SBS 11.3.5-3 Roof Anchors (PMRA) | SBS 11.3.5-3 Roof Anchors (PMRA)]]
  
====Part 13 - Linear Metal Flashing====
+
====PROTECTED MEMBRANES and OTHER DETAILS====
:See the separate page, [[Linear_Metal_Flashing_Details | Construction Details for Linear Metal Flashings]].
 
  
====Part 14 - The Roof as a Platform====
+
====METAL FLASHINGS====
  
:'''Structures and Equipment''' ([[Model_SBS_Standard_(2022)#14.3.2.7._Structures_and_Equipment | Article 14.3.2.7.]])
+
====THE ROOF as a PLATFORM====
:[[SBS 14.3.3 Structures and Equipment (planter pre-curb) | Planter Wall ("pre-curb")]]
+
:[[SBS 14.3.3 Structures and Equipment (planter pre-curb) | SBS 14.3.3 Structures and Equipment (planter pre-curb)]]
  
 
</div>
 
</div>

Revision as of 20:46, 10 June 2022


Division D - Construction Details

Construction Details for SBS-modified Bitumen Membrane Roof Systems
The drawings linked on this page are intended to represent a variety of SBS-modified Bitumen Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturers’ specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
For further information about SBS-modified Bitumen Membrane System designs and requirements, see the Standard for SBS-modified Bitumen Membrane Roof Systems.
SBS Systems page thumb.JPG

Pdf.png

NOTE: 'PDF' shown after a file name below indicates a downloadable print sheet is available for Construction Details. Click on the detail link and look for the icon.


Standard for SBS-modified Bitumen Membrane Roof Systems

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.