Difference between revisions of "Division C - Search by System (under revision)"
Difference between revisions of "Division C - Search by System (under revision)"
Line 35: | Line 35: | ||
<big>'''Division A: Scope, Use of Standards, and Guarantee'''</big> | <big>'''Division A: Scope, Use of Standards, and Guarantee'''</big> | ||
− | :[http://{{SERVERNAME}}/index.php?title= | + | :[http://{{SERVERNAME}}/index.php?title=Scope_of_RPM_and_Standards <i class="fa fa-angle-right"></i> Scope of RPM and Standards] |
+ | :[http://{{SERVERNAME}}/index.php?title=Structure_and_Organization_of_RPM_and_Standards <i class="fa fa-angle-right"></i> Structure and Organization] | ||
:[http://{{SERVERNAME}}/index.php?title=Guarantee <i class="fa fa-angle-right"></i> Guarantee] | :[http://{{SERVERNAME}}/index.php?title=Guarantee <i class="fa fa-angle-right"></i> Guarantee] | ||
Revision as of 15:53, 26 August 2021
RCABC Roofing Practices Manual (RPM)
Official manual of the RoofStar Guarantee Program
Official manual of the RoofStar Guarantee Program
Table of Contents
Division A: Scope, Use of Standards, and Guarantee
Division B: Standards
- Standards for Roof Waterproofing Systems
- "SBS" Systems
- EPDM Systems
- TPO Systems
- PVC Systems
- "Hot Rubber" Systems (TBA)
- PMMA Liquid Systems (TBA)
- "BUR" Systems
- Standards for Water-Shedding Systems
- "ASM") Systems
- Asphalt Shingle Systems
- Cedar Systems
- Tile & Slate Systems
- Standards for Grade-level Waterproofing Systems
- "SBS" Systems (TBA)
- "Hot Rubber" Systems (TBA)
- PVC Systems (TBA)
Division C: Accepted Materials
Division D: Construction Details
- "SBS" Systems
- EPDM Systems
- TPO Systems
- PVC Systems
- "BUR" Systems
- "ASM" Systems
- Asphalt Shingle Systems
- Cedar Systems
- Tile & Slate Systems
- Grade-level Waterproofing Systems
Division E: General Information
Updates and Revisions
The Roofing Practices Manual (RPM) is the official repository of Standards necessary to qualify roof and grade-level waterproofing projects for a RoofStar Guarantee.
The RPM is revised at least three times per calendar year. Yellow highlighted text indicates a change to the Manual within the past twelve months, and remains in effect for one full year (365 days). For a summary of each update catalogued since 2010, use the Technical Updates button above.
- click HERE for a brief tutorial of the Roofing Practices Manual
Wind Uplift design resources
Specified Wind Load Calculators
Tested Assembly Report Library (CSA-A123.21)