Difference between revisions of "Division C - Search by System (under revision)"

Jump to: navigation, search

Difference between revisions of "Division C - Search by System (under revision)"

Line 104: Line 104:
 
<!-- START OF WELCOME PANEL -->
 
<!-- START OF WELCOME PANEL -->
 
<div class="col-md-5">
 
<div class="col-md-5">
<div class="panel panel-primary">
+
<div class="panel panel-info">
 
   <div class="panel-heading text-center">'''<big><big><big>'''Updates and Revisions'''</big></big></big>'''</div>
 
   <div class="panel-heading text-center">'''<big><big><big>'''Updates and Revisions'''</big></big></big>'''</div>
 
   <div class="panel-body">
 
   <div class="panel-body">

Revision as of 18:32, 27 April 2021

Updates and Revisions

The Roofing Practices Manual is the official guide for RCABC Members, Accepted Observers, consultants, architects and specification writers designing or installing Waterproofing or Water-shedding systems, and describes the RoofStar Guarantee Standards, Guiding Principles and Recommended Practices necessary to qualify for a RoofStar Guarantee. The RPM meets or exceeds the current national and provincial standards for construction and wind uplift design resistance. See the Table of Contents below.

NOTICE to Readers:

This Manual is revised at least three times per calendar year. Yellow highlighted text indicates a change to the Manual within the past twelve months, and remains in effect for one full year (365 days). For a summary of each update catalogued since 2010, use the Technical Updates button below.


click HERE for a brief tutorial of the Roofing Practices Manual

Last Update: February 5, 2021


Wind Uplift design resources
See Part 3 in any of the membrane system Standards
Wind-RCI calculator
Wind-MVRA calculator
Tested Assembly Report Library (CSA-A123.21)
AARS Tested Assembly reports
PARS Tested Assembly reports
MARS Tested Assembly reports