Difference between revisions of "Division C - Search by System (under revision)"

Jump to: navigation, search

Difference between revisions of "Division C - Search by System (under revision)"

Line 106: Line 106:
 
   <div class="panel-heading text-center">'''<big><big><big>'''Updates and Revisions'''</big></big></big>'''</div>
 
   <div class="panel-heading text-center">'''<big><big><big>'''Updates and Revisions'''</big></big></big>'''</div>
 
   <div class="panel-body">
 
   <div class="panel-body">
 +
<div class="col-md-4">
 +
<html><a class="btn btn-lg btn-warning forcewhite" href="http://www.rcabc.org/technical/technical-updates/">Technical Updates</a></html>
 +
</div>
 +
<div class="col-md-1">
 +
</div>
 +
<div class="col-md-5">
 +
<big>'''Last Update:<br>February 5, 2021'''</big>
 +
</div>
 +
<div class="col-md-12">
 +
<hr>
 
The '''Roofing Practices Manual''' is ''the'' official guide for RCABC Members, Accepted Observers, consultants, architects and specification writers designing or installing Waterproofing or Water-shedding systems, and describes the '''''RoofStar Guarantee Standards''''', Guiding Principles and Recommended Practices necessary to qualify for a RoofStar Guarantee.  The RPM meets or exceeds the current national and provincial standards for construction and wind uplift design resistance.  See the Table of Contents below.
 
The '''Roofing Practices Manual''' is ''the'' official guide for RCABC Members, Accepted Observers, consultants, architects and specification writers designing or installing Waterproofing or Water-shedding systems, and describes the '''''RoofStar Guarantee Standards''''', Guiding Principles and Recommended Practices necessary to qualify for a RoofStar Guarantee.  The RPM meets or exceeds the current national and provincial standards for construction and wind uplift design resistance.  See the Table of Contents below.
  
Line 111: Line 121:
  
 
This ''Manual'' is revised at least three times per calendar year.  <span style="background:yellow">Yellow highlighted</span> text indicates a change to the ''Manual'' within the past twelve months, and remains in effect for one full year (365 days).  For a summary of each update catalogued since 2010, use the '''Technical Updates''' button below.
 
This ''Manual'' is revised at least three times per calendar year.  <span style="background:yellow">Yellow highlighted</span> text indicates a change to the ''Manual'' within the past twelve months, and remains in effect for one full year (365 days).  For a summary of each update catalogued since 2010, use the '''Technical Updates''' button below.
<div class="col-md-12">
 
 
<hr>
 
<hr>
 
::[https://www.youtube.com/watch?v=2mDmCe6AKXI <i class="fa fa-video-camera fa-2x"></i> click '''HERE'''] for a brief tutorial of the '''''Roofing Practices Manual'''''
 
::[https://www.youtube.com/watch?v=2mDmCe6AKXI <i class="fa fa-video-camera fa-2x"></i> click '''HERE'''] for a brief tutorial of the '''''Roofing Practices Manual'''''
 
<hr>
 
<hr>
</div>
 
<div class="col-md-4">
 
<html><a class="btn btn-lg btn-warning forcewhite" href="http://www.rcabc.org/technical/technical-updates/">Technical Updates</a></html>
 
</div>
 
<div class="col-md-1">
 
</div>
 
<div class="col-md-5">
 
<big>'''Last Update:<br>February 5, 2021'''</big>
 
 
</div>
 
</div>
 
</div>
 
</div>

Revision as of 20:35, 3 May 2021

Updates and Revisions

Last Update:
February 5, 2021


The Roofing Practices Manual is the official guide for RCABC Members, Accepted Observers, consultants, architects and specification writers designing or installing Waterproofing or Water-shedding systems, and describes the RoofStar Guarantee Standards, Guiding Principles and Recommended Practices necessary to qualify for a RoofStar Guarantee. The RPM meets or exceeds the current national and provincial standards for construction and wind uplift design resistance. See the Table of Contents below.

NOTICE to Readers:

This Manual is revised at least three times per calendar year. Yellow highlighted text indicates a change to the Manual within the past twelve months, and remains in effect for one full year (365 days). For a summary of each update catalogued since 2010, use the Technical Updates button below.


click HERE for a brief tutorial of the Roofing Practices Manual


Wind Uplift design resources
See Part 3 in any of the membrane system Standards
Tested Assembly Report Library (CSA-A123.21)
AARS Tested Assembly reports
PARS Tested Assembly reports
MARS Tested Assembly reports