Search results

Jump to: navigation, search

Search results

Page title matches

Page text matches

  • #REDIRECT [[SBS 2-Part Retrofit Flashing (Cable Penetration)]]
    62 bytes (7 words) - 18:29, 27 June 2022
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re
    5 KB (808 words) - 16:06, 9 September 2021
  • checkType('getArgs', 2, options, 'table', true) 2
    9 KB (1,372 words) - 22:27, 2 July 2015
  • ...s are generally manufactured using three materials: (1) modified bitumen, (2) reinforcement fibers, commonly woven as a sheet and embedded within the me
    5 KB (703 words) - 16:54, 23 November 2015
  • ...s are generally manufactured using three materials: (1) modified bitumen, (2) reinforcement fibers, commonly woven as a sheet and embedded within the me ...sheet with a minimum tensile strength of 785 N/50 mm (CGSB 37-GP-56M Grade 2).
    22 KB (3,281 words) - 21:46, 17 July 2017
  • :Poured 25 mm (1") for NVS and 50 mm (2") for Insulcel thickness over EPS insulation, these LWIC systems have been
    3 KB (474 words) - 21:16, 12 February 2019
  • ::[[BUR Roof Systems Standard#BURDECKS | 2 ROOF DECKS]]
    2 KB (209 words) - 21:11, 30 August 2021
  • ...ization_of_RPM_and_Standards <i class="fa fa-angle-double-right"></i> Part 2 - Structure and Organization] <div class="col-md-2">
    11 KB (1,581 words) - 19:51, 15 November 2021
  • | colspan="2" | An Accessory is a material that joins Primary or Secondary Materials to
    2 KB (288 words) - 22:14, 8 September 2021
  • #REDIRECT [[SBS 11.3.2.5-2 Scuppers and Overflows (through-wall scupper)]]
    74 bytes (8 words) - 15:59, 27 August 2021
  • ;(2) '''Adhesion''': Membranes must be fully adhered, where exposed, and mechan
    3 KB (356 words) - 14:32, 30 June 2022
  • <big><big><big><big><big>Roofs: 2-Component PMMA</big></big></big></big></big>
    1 KB (178 words) - 21:51, 7 September 2021
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    974 bytes (140 words) - 15:31, 24 October 2017
  • ==={{hilite | 2. Material Acceptance Criteria || 2022-June-17 }}=== ...ace installation in British Columbia, over a period of no less than a two (2) years, ending at the time of application (Note: this can be supplemented b
    22 KB (3,050 words) - 16:20, 12 December 2023
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re ====1.1.1.2. Tanks ====
    14 KB (2,333 words) - 16:39, 9 February 2022
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    6 KB (742 words) - 20:36, 27 July 2021
  • <div class="col-md-2"> ...([[SBS_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])=====
    7 KB (906 words) - 16:03, 26 February 2024
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:34, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:34, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:35, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:32, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:33, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:33, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:33, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:34, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:34, 23 October 2017
  • ....3.2.4. General Requirements for Asphalt Shingle Application | Article 9.3.2.4.]])</big></big></big></big></big> [[File:7.1.2.1.1.jpg| link= http://rpm.rcabc.org/images/6/6f/7.1.2.1.1.jpg | class=img-responsive]]
    3 KB (343 words) - 14:29, 30 June 2022
  • Applicable to slopes 1:6 (2" in 12") and greater. ...ply of self-adhered modified bituminous underlayment material. Lap 50 mm (2") minimum on sides and 150 mm (6") minimum on ends. (See Section 3.1.5 for
    2 KB (260 words) - 22:52, 21 December 2015
  • ...d#10.3.7.2. Intersections with Waterproofing Roof Systems | Article 10.3.7.2.]])</big></big></big></big></big> | [[File:ASh Intersection with Waterproofing Roof (Upper) 2.jpg | link=https://rpm.rcabc.org/images/8/81/ASh_Intersection_with_Waterpro
    3 KB (344 words) - 14:13, 5 October 2022
  • ...d#10.3.7.2. Intersections with Waterproofing Roof Systems | Article 10.3.7.2.]])</big></big></big></big></big> | [[File:ASh Intersection with Waterproofing Roof (Lower) 2.jpg| link=https://rpm.rcabc.org/images/4/46/ASh_Intersection_with_Waterproo
    3 KB (351 words) - 14:11, 5 October 2022
  • (2) <b>Fold Layout</b>: Formed from a minimum 26 guage galvanized steel divert
    1 KB (196 words) - 22:57, 21 December 2015
  • ...ypical) ([[Asphalt_Shingle_Systems_Standard#12.3.2.4. Curbs | Article 12.3.2.4.]])</big></big></big></big></big> ;(2) [[Asphalt Shingle Systems Standard#AShPART11-APRON|'''Apron Flashing''']]
    2 KB (312 words) - 14:39, 30 June 2022
  • ...[ASM_Roof_Systems_Standard#10.3.4.2. Eaves and Rake Edges | Article 10.3.4.2.]])</big></big></big></big></big> ;(2) [[ASM Roof Systems Standard#10.3.4.2. Eaves and Rake Edges | '''Hook securement strip''']]: In this particular r
    3 KB (473 words) - 18:24, 28 June 2022
  • ...are unitized (for example, pavers on pedestals) and do not exceed 1 M<sup>2</sup> or 90 Kg (200 lb.) per unit.
    9 KB (1,253 words) - 17:05, 10 December 2021
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    416 KB (56,532 words) - 22:23, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    424 KB (57,418 words) - 22:20, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    421 KB (57,062 words) - 22:20, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    296 KB (41,811 words) - 22:23, 5 April 2024
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    2 KB (235 words) - 20:34, 26 July 2021
  • #REDIRECT [[SBS Details:D1.7.2-2 Parapets & Copings (Low Parapet - Unsupported by Wall)]]
    89 bytes (13 words) - 17:51, 16 September 2016
  • #REDIRECT [[SBS Details:D1.7.3-2 Edges & Fascia (Gravel Stop)]]
    63 bytes (9 words) - 17:56, 16 September 2016
  • #REDIRECT [[SBS Details:D1.7.5-2 Roof-Wall Transitions (Divider/Joint)]]
    72 bytes (9 words) - 18:08, 16 September 2016
  • #REDIRECT [[SBS Details:D1.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)]]
    80 bytes (10 words) - 18:12, 16 September 2016
  • #REDIRECT [[SBS Details:D1.7.7-2 Strip-in Flashings (Two-part Cable)]]
    70 bytes (9 words) - 18:15, 16 September 2016
  • #REDIRECT [[SBS Details:D1.7.8-2 Water & Drainage (Spun Copper Drain)]]
    71 bytes (10 words) - 18:18, 16 September 2016
  • #REDIRECT [[SBS Details:D1.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)]]
    100 bytes (13 words) - 18:22, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.1-2 Assemblies (Ballasted Protected Membrane)]]
    77 bytes (9 words) - 21:21, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.2-2 Parapets & Copings (Parapet - Wall Transition)]]
    82 bytes (11 words) - 21:22, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.3-2 Edges & Fascia (Gravel Stop)]]
    64 bytes (9 words) - 21:23, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)]]
    92 bytes (12 words) - 21:24, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.5-2 Roof-Wall Transitions (Divider/Joint)]]
    73 bytes (9 words) - 21:28, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)]]
    81 bytes (10 words) - 21:29, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.7-2 Strip-in Flashings (Two-part Cable)]]
    71 bytes (9 words) - 21:30, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.8-2 Water & Drainage (Spun Copper Drain)]]
    72 bytes (10 words) - 21:31, 16 September 2016
  • #REDIRECT [[EPDM Details:D2.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)]]
    101 bytes (13 words) - 21:33, 16 September 2016
  • #REDIRECT [[TPO Details:D3.7.1-2 Assemblies (Ballasted Protected Membrane)]]
    76 bytes (9 words) - 15:12, 19 September 2016
  • #REDIRECT [[TPO Details:D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)]]
    81 bytes (11 words) - 15:13, 19 September 2016
  • #REDIRECT [[TPO Details:D3.7.3-2 Edges & Fascia (Gravel Stop)]]
    63 bytes (9 words) - 15:14, 19 September 2016
  • #REDIRECT [[TPO Details:D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)]]
    91 bytes (12 words) - 15:15, 19 September 2016
  • #REDIRECT [[TPO Details:D3.7.5-2 Roof-Wall Transitions (Divider/Joint)]]
    72 bytes (9 words) - 15:17, 19 September 2016
  • #REDIRECT [[TPO Details:D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)]]
    80 bytes (10 words) - 15:19, 19 September 2016
  • #REDIRECT [[TPO Details:D3.7.7-2 Strip-in Flashings (Two-part Cable)]]
    70 bytes (9 words) - 15:27, 19 September 2016
  • #REDIRECT [[TPO Details:D3.7.8-2 Water & Drainage (Spun Copper Drain)]]
    71 bytes (10 words) - 15:27, 19 September 2016
  • #REDIRECT [[TPO Details:D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)]]
    100 bytes (13 words) - 15:29, 19 September 2016
  • ::<big>[[Catalyzed 2-Component Polymethyl Methacrylate (PMMA) | Catalyzed 2-Component PMMA]]</big> ::<big>[[Catalyzed 2-Component Polymethyl Methacrylate (PMMA) | Catalyzed 2-Component PMMA]]</big>
    13 KB (1,636 words) - 17:02, 5 January 2024
  • Minimum roof slope is 1:6 (2" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" ...index.php?title=ASM_Roof_Systems_Standard#Section_9.2._Materials Section 9.2.] of the Standard.
    5 KB (684 words) - 14:23, 27 October 2023
  • * {{hilite | A Performance Review conducted at the 2-year anniversary of the Project completion date, presented in writing joint ...terproofing Projects only, both upon completion of construction and at the 2-year anniversary of the Project completion date. || 2020-February-14 }}
    2 KB (284 words) - 18:25, 19 August 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re
    3 KB (386 words) - 15:33, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re
    2 KB (308 words) - 15:59, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re ...r low-slope roofing (i.e., membrane roofing) shall be a minimum 12.7 mm (1/2")and as indicated in the applicable the BC Building Code (latest edition).
    20 KB (2,969 words) - 16:06, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re
    1 KB (198 words) - 15:33, 9 September 2021
  • ...h ''Overburden'', equipment or living (amenity) spaces</span> (see '''14.1.2.1'''). ...abilities for all waterproofed surfaces, and should extend at least 50 mm (2") vertically from the water plane at</span>
    11 KB (1,608 words) - 22:03, 3 May 2021
  • <big><big><big><big><big>Part 2 - Structure and Organization of RPM and Standards</big></big></big></big></ ==Section 2.1. How to Read Standards==
    15 KB (2,132 words) - 19:02, 18 August 2023
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re <td rowspan=2>C =</td>
    23 KB (3,279 words) - 15:42, 9 September 2021
  • ::<big><big>[[Waterproofing Systems: 2-Ply SBS Membrane Systems | 2-Ply SBS Waterproofing Membrane Systems]]</big></big>
    1 KB (125 words) - 18:02, 22 June 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big>
    2 KB (225 words) - 21:24, 7 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re
    4 KB (532 words) - 15:44, 9 September 2021
  • ...rd#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> ;(2) '''Flashing Flange''': minimum 100 mm (4") flange set in coating of compat
    3 KB (360 words) - 18:16, 27 October 2023
  • ...rd#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> [[File:10.3.7.2.jpg| link=http://rpm.rcabc.org/images/9/9a/10.3.7.2.jpg | class=img-responsive]]
    2 KB (262 words) - 18:33, 27 June 2022
  • ...rd#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> ;(2) [[SBS Roof Systems Standard#PART_13|'''Counter-flashing''']]
    2 KB (284 words) - 18:34, 27 June 2022
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:43, 23 October 2017
  • ;(2) [[TPO Roof Systems Standard#PART_9|'''Single-ply Membrane''']]: Installed
    3 KB (429 words) - 21:34, 27 June 2022
  • ;(2) [[EPDM Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically attac
    3 KB (367 words) - 21:52, 27 June 2022
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:23, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:23, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:23, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:24, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:24, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:25, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:25, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:25, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:26, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:26, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:26, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:27, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:27, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:27, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:27, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:28, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:28, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMVAPOUR|'''Vapo
    3 KB (351 words) - 16:48, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMVAPOUR|'''Vapo
    3 KB (347 words) - 16:48, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1,011 bytes (124 words) - 21:30, 16 September 2016
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:28, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMVAPOUR|'''Vapo
    3 KB (332 words) - 16:49, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:29, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:29, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:29, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMVAPOUR|'''Vapo
    3 KB (334 words) - 18:30, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:30, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:30, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:30, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 16:50, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (126 words) - 18:31, 23 October 2017
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re ...he issue. If a roof requires 1.7 kPa (35 psf) uplift resistance, a 1.2 m x 2.4 m (4&#8217; x 8&#8217; or 32 ft&#178;) sheet of insulation would require
    7 KB (999 words) - 15:42, 9 September 2021
  • :Part 2: The Building Code and wind ...des “control or directives on legal authority”[[#Footnotes|<sup><small>2</small></sup>]]. The Building Regulation is managed by the British Columb
    21 KB (3,118 words) - 16:32, 16 March 2023
  • ;(2) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically fasten ...ll Surface - Plywood''']]: Conform to the requirements for Walls in '''2.6.2 Materials'''.
    3 KB (440 words) - 18:14, 27 October 2023
  • ;(2) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insul
    3 KB (420 words) - 18:15, 27 October 2023
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re * Type 2 (Flat) asphalt is moderately susceptible to flow at roof temperatures. It i
    15 KB (2,293 words) - 15:33, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re ...sheet with a minimum tensile strength of 785 N/50 mm (CGSB 37-GP-56M Grade 2).
    23 KB (3,307 words) - 15:57, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re ...ed only for slopes exceeding 1:24 (1/2" in 12") but not exceeding 1:5 (2-1/2" in 12"). This will prevent the weight of the asphalt and gravel from causi
    8 KB (1,280 words) - 16:25, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re ...all piece of fabric is to be used, its dimension shall be at least 2.5 m x 2.5 m (8&#8217; x 8&#8217;). Slit fabric to fit over roof penetrations, cut o
    11 KB (1,624 words) - 16:21, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re
    2 KB (256 words) - 16:19, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re <th colspan=2>Natural Air Flow Ventilators</th>
    6 KB (911 words) - 15:33, 9 September 2021
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re
    3 KB (400 words) - 15:35, 9 September 2021
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 [[File:D3.7.8(2).jpg|class=img-responsive]]
    4 KB (462 words) - 17:01, 23 October 2017
  • [[File:6.3.2.1.jpg|class=img-responsive]] ;(2) [[EPDM Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically attac
    2 KB (281 words) - 21:53, 27 June 2022
  • ;(2) [[EPDM Roof Systems Standard#PART_9 |'''Single-ply Membrane''']]: Installe
    3 KB (422 words) - 21:33, 27 June 2022
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOVAPOUR|'''Va
    3 KB (382 words) - 17:02, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOVAPOUR|'''Va
    3 KB (360 words) - 17:01, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOVAPOUR|'''Va
    3 KB (374 words) - 17:02, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOVAPOUR|'''Va
    3 KB (373 words) - 17:02, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:43, 23 October 2017
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    1 KB (161 words) - 20:33, 26 July 2021
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:42, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:42, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:42, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:43, 23 October 2017
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.2.3.2.1.jpg| link=http://rpm.rcabc.org/images/b/bc/7.2.3.2.1.jpg | class=img-responsive]]
    2 KB (266 words) - 21:05, 7 September 2021
  • <big><big><big><big><big>CS Details:E3.7.2 (Flashings)</big></big></big></big></big> | colspan="2" | <big>'''''Notice to Reader'''''</big>
    2 KB (264 words) - 21:05, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.2.4.2.jpg| link=http://rpm.rcabc.org/images/6/6c/7.2.4.2.jpg | class=img-responsive]]
    3 KB (493 words) - 21:06, 7 September 2021
  • <big><big><big><big><big>WP Details:F1.7.2 (Wearing Course - Unit Masonry)</big></big></big></big></big> | colspan="2" | <big>'''''Notice to Reader'''''</big>
    4 KB (458 words) - 21:14, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:9.6.1.jpg| link=http://rpm.rcabc.org/images/2/2b/9.6.1.jpg | class=img-responsive]]
    4 KB (454 words) - 21:14, 7 September 2021
  • ;(2) '''Adhesion''': Membranes must be fully adhered, where exposed, and mechan ...tection membrane must overlap built-in gutter membrane by a minimum of 203.2 mm (8") and be installed in shingle fashion (not shown for clarity).
    3 KB (368 words) - 16:01, 18 March 2024
  • ...[ASM_Roof_Systems_Standard#10.3.4.2. Eaves and Rake Edges | Article 10.3.4.2.]])</big></big></big></big></big> ;(2) [[ASM Roof Systems Standard#10.3.4.2. Eaves and Rake Edges | '''Hook securement strip''']]: In this particular r
    3 KB (472 words) - 18:24, 28 June 2022
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (128 words) - 15:20, 19 September 2016
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:41, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:41, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:42, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:40, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:40, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:40, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:41, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:39, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:39, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:39, 23 October 2017
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    1 KB (131 words) - 18:40, 23 October 2017
  • ...ystems_Standard#9.3.2.5. Application on Slopes Less Than 1:3 | Article 9.3.2.5.]])</big></big></big></big></big> <big>Applicable to slopes 1:6 (2" in 12") and greater.</big>
    3 KB (386 words) - 14:29, 30 June 2022
  • ..._Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])</big></big></big></big></big> [[File:SBS 11.3.3.2.-3B.jpg| link=http://rpm.rcabc.org/images/6/6c/D1.7.6-4%281%29.jpg | class=
    4 KB (607 words) - 18:19, 27 October 2023
  • ...rd#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> [[File:SBS 11.3.3.3-2 2-Part Cable 1.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/8/
    4 KB (630 words) - 18:16, 27 October 2023
  • ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    3 KB (420 words) - 18:14, 27 October 2023
  • ..._Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])</big></big></big></big></big> ...pg|class=img-responsive | link=http://rpm.rcabc.org/images/f/f5/SBS_11.3.3.2-1_Basic_Curb.jpg]]
    3 KB (474 words) - 18:18, 27 October 2023
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) '''Insulation Overlay Protection''': Recommended.
    2 KB (291 words) - 16:27, 26 April 2019
  • ...s_Standard#8.3.2.3. Underlayment for Common and Steep Slopes | Article 8.3.2.3.]])</big></big></big></big></big> ;(2) [[ASM Roof Systems Standard#PART_13|'''Metal edge flashing''']]: Installed
    2 KB (328 words) - 14:53, 28 June 2022
  • ...tems_Standard#8.3.2.4. Underlayment for Slopes Less Than 1:3 | Article 8.3.2.4.]])</big></big></big></big></big> [[File:ASM 8.1.2 Self-Adhered Underlayment.jpg|class=img-responsive | link=http://rpm.rcabc.
    2 KB (298 words) - 14:55, 28 June 2022
  • ...[ASM_Roof_Systems_Standard#10.3.4.2. Eaves and Rake Edges | Article 10.3.4.2.]])</big></big></big></big></big> ;(1) [[ASM Roof Systems Standard#13.3.2.1. General Requirements for Linear Metal Flashing | '''Separation membrane'
    4 KB (483 words) - 18:24, 28 June 2022
  • ...[ASM_Roof_Systems_Standard#10.3.4.2. Eaves and Rake Edges | Article 10.3.4.2.]])</big></big></big></big></big> ;(2) [[ASM Roof Systems Standard#8.1.3.4. Separation Between Materials |'''Sepa
    2 KB (297 words) - 18:04, 28 June 2022
  • ...#10.3.5.2. General Requirements for Valley Metal Flashing | Article 10.3.2.2.]] and [[ASM_Roof_Systems_Standard#10.3.5.3. Hooked Metal Valleys | Article ;(1) [[ASM Roof Systems Standard#8.1.3.2. Valley Protection |'''Valley Protection Membrane''']]: Accepted self-adher
    3 KB (407 words) - 18:24, 28 June 2022
  • ...#10.3.5.2. General Requirements for Valley Metal Flashing | Article 10.3.2.2.]] and [[ASM_Roof_Systems_Standard#10.3.5.4. Unhooked Metal Valleys | Artic [[File:ASM 10.3.2 Unhooked Valley Flashing.jpg|class=img-responsive | link=http://rpm.rcabc.o
    3 KB (416 words) - 18:24, 28 June 2022
  • .... General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...on.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/1/1a/ASM_10.2.1_Roof-Headwall_Connection.jpg]]
    4 KB (540 words) - 17:25, 28 June 2022
  • ...rd#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> ;(2) [[ASM Roof Systems Standard#PART_7|'''Insulation''']]: Offset and stagger
    3 KB (432 words) - 19:00, 28 June 2022
  • ...rd#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> ;(2) [[ASM Roof Systems Standard#8.1.3.3. Field Underlayment|'''Underlayment'''
    4 KB (537 words) - 17:35, 17 March 2023
  • ...) ([[ASM_Roof_Systems_Standard#12.3.2.4._Curbs_and_Sleepers | Article 12.3.2.4.]])</big></big></big></big></big> ...el.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/4/40/ASM_11.2.1_Curb%2C_Split_Panel.jpg]]
    4 KB (530 words) - 20:11, 28 June 2022
  • .... General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]] and [[ASM_Roof_Systems_Standard#10.3.4.1. Ridges | Article 10.3.4.1.]] ;(2) [[ASM Roof Systems Standard#8.1.3.5. Ventilation Beneath Panels|'''Ventila
    3 KB (370 words) - 17:54, 28 June 2022
  • .... General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]] and [[ASM_Roof_Systems_Standard#10.3.4.1. Ridges | Article 10.3.4.1.]] ...ntee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
    3 KB (430 words) - 16:23, 28 June 2022
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSLIP|'''Slip She
    2 KB (310 words) - 16:34, 26 April 2019
  • .... General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...d).jpg|class=img-responsive | link=http://rpm.rcabc.org/images/5/5a/ASM_10.2.2_Roof-Headwall_Connection_%28Vented%29.jpg]]
    3 KB (464 words) - 17:31, 28 June 2022
  • [[File:ASM 12.1.2 Built-in Gutter Assembly UPLOADED.jpg|class=img-responsive | link=http://rp ;(2) [[ASM Roof Systems Standard#8.1.3.3. Field Underlayment|'''Underlayment (l
    5 KB (611 words) - 18:17, 12 March 2024
  • ...r architectural concealed fastener metal roofing systems (refer to Section 2.1.4 and 8.1.6.1). RGC Guarantee Standards for the application of copper met (2) <b>Ice Dam Protection and Underlay:</b> RGC accepted self-adhered modified
    3 KB (379 words) - 22:50, 21 December 2015
  • [[File:8.1.6.2.jpg]] (2) <b>Ice Dam Protection / Insulation Overlay: </b>For slopes 2:12 to 4:12 use RGC accepted self-adhered modified bituminous membrane.
    3 KB (421 words) - 22:51, 21 December 2015
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.4.1.2.1.jpg| link=http://rpm.rcabc.org/images/c/c1/7.4.1.2.1.jpg | class=img-responsive]]
    4 KB (607 words) - 21:09, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> (2) <b>Adhesion:</b> Membranes must be fully adhered, where exposed, and mecha
    3 KB (425 words) - 21:06, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ;(2) ADHESION: Membranes must be fully adhered, where exposed, and mechanically
    3 KB (401 words) - 21:12, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.3.2.2.12.jpg| link=http://rpm.rcabc.org/images/9/90/7.3.2.2.12.jpg | class=img-responsive]]
    2 KB (370 words) - 21:07, 7 September 2021
  • <big><big><big><big><big>TS Details:E4.7.2 (Tile - Rake Edge)</big></big></big></big></big> | colspan="2" | <big>'''''Notice to Reader'''''</big>
    2 KB (311 words) - 21:07, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.3.2.2.16.jpg| link=http://rpm.rcabc.org/images/8/8d/7.3.2.2.16.jpg | class=img-responsive]]
    3 KB (375 words) - 21:08, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.3.2.2.17.jpg| link=http://rpm.rcabc.org/images/f/f7/7.3.2.2.17.jpg | class=img-responsive]]
    2 KB (359 words) - 21:08, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.3.2.2.15.jpg| link=http://rpm.rcabc.org/images/b/bd/7.3.2.2.15.jpg | class=img-responsive]]
    2 KB (298 words) - 21:08, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ...protection / underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps.
    3 KB (387 words) - 21:09, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.4.1.2.4.jpg| link=http://rpm.rcabc.org/images/1/1e/7.4.1.2.4.jpg | class=img-responsive]]
    3 KB (377 words) - 21:10, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.4.1.2.6.jpg| link=http://rpm.rcabc.org/images/9/93/7.4.1.2.6.jpg | class=img-responsive]]
    2 KB (366 words) - 21:10, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.4.1.2.8.jpg| link=http://rpm.rcabc.org/images/1/13/7.4.1.2.8.jpg | class=img-responsive]]
    3 KB (379 words) - 21:11, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.4.1.2.10.jpg| link=http://rpm.rcabc.org/images/f/fb/7.4.1.2.10.jpg | class=img-responsive]]
    3 KB (439 words) - 21:11, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:7.4.1.2.11.jpg| link=http://rpm.rcabc.org/images/1/13/7.4.1.2.11.jpg | class=img-responsive]]
    2 KB (277 words) - 21:11, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:9.6.3.jpg| link=http://rpm.rcabc.org/images/2/27/9.6.3.jpg | class=img-responsive]]
    4 KB (484 words) - 21:15, 7 September 2021
  • ;(2) [[TPO Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically attach
    3 KB (383 words) - 21:38, 27 June 2022
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ...th fibreglass facer and silicone treated core, minimum thickness 12 mm (1/2"), conforming to ASTM E 661
    4 KB (527 words) - 21:15, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ;(2) [[Grade-level Waterproofing Standard#WPSTRIPPING | '''Membrane flashing (s
    4 KB (527 words) - 21:16, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:D1.7.24 (View 2).jpg| link=http://rpm.rcabc.org/images/c/ca/D1.7.6-5_%282%29.jpg | class=im
    5 KB (580 words) - 21:16, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ;(2) [[Grade-level Waterproofing Standard#WPSTRIPPING | '''Membrane Flashing'''
    4 KB (560 words) - 21:17, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ;(2) [[Grade-level Waterproofing Standard#WPSTRIPPING | '''Membrane Flashing'''
    4 KB (596 words) - 21:17, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ;(2) [[Grade-level Waterproofing Standard#WPSTRIPPING | '''Membrane Flashing (s
    4 KB (463 words) - 21:18, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ;(2) [[Grade-level Waterproofing Standard#WPSTRIPPING | '''Membrane Flashing'''
    4 KB (475 words) - 21:21, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ;(2) [[Grade-level Waterproofing Standard#WPMEMBRANE | '''Primary Waterproofing
    4 KB (467 words) - 21:21, 7 September 2021
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ;(2) [[Grade-level Waterproofing Standard#WPMEMBRANE | '''Primary Waterproofing
    3 KB (413 words) - 21:22, 7 September 2021
  • ...([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])</big></big></big></big></big> [[File:SBS 10.3.5.3 Cant Edge (2).jpg|class=img-responsive | link=http://rpm.rcabc.org/images/9/91/SBS_10.3.
    3 KB (472 words) - 17:57, 27 October 2023
  • ...le:SBS 1.3.1-1.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/2/29/SBS_1.3.1-1.jpg]] ;(2) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Installed in stagge
    3 KB (446 words) - 17:36, 27 October 2023
  • ...._General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]]; [[SBS_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]]) ...piece over the top and down the exterior face as required in Article 10.3.2.3.
    4 KB (633 words) - 21:01, 1 November 2022
  • ...andard#PART_9|'''Base Membrane (field)''']]: See Tables '''9.1''' and '''9.2''' for acceptable membrane types and application methods. ;(2) [[SBS Roof Systems Standard#PART_10|'''Base Membrane (flashing)''']]: Carr
    5 KB (661 words) - 17:37, 27 October 2023
  • ...BS_Roof_Systems_Standard#14.3.2.7._Structures_and_Equipment | Article 14.3.2.7.]])</big></big></big></big></big> [[File:D1.7.6-5 (2).jpg| link=http://rpm.rcabc.org/images/c/ca/D1.7.6-5_%282%29.jpg | class=im
    4 KB (513 words) - 18:21, 27 October 2023
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ...ubstrates) and extend down the outside face of the parapet at least 50 mm (2”). Edges must be hemmed (1a), although a kicked-out drip edge is optiona
    4 KB (557 words) - 17:40, 13 December 2022
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:10.2.1.1.jpg| link=http://rpm.rcabc.org/images/9/9d/10.2.1.1.jpg | class=img-responsive]]
    3 KB (397 words) - 14:09, 10 August 2023
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:10.2.1.2.jpg| link=http://rpm.rcabc.org/images/4/4b/10.2.1.2.jpg | class=img-responsive]]
    3 KB (400 words) - 19:08, 22 November 2022
  • * Straight claw hammer, spud bar or 35 mm (1-1/2") chisel to remove aggregate ...reas for note taking. These might by alphanumeric such as Roof Area A-1, A-2, etc., or by function such as &#8220;Boiler Room&#8221;. Note building heig
    75 KB (11,617 words) - 21:00, 3 September 2021
  • :<table cellspacing="0" cellpadding="2" border=1> <td nowrap>1:2</td>
    7 KB (981 words) - 15:37, 9 June 2022
  • ...nal Standards of Canada: The International System of Units (SI), CAN3-Z234.2-76, and the Canadian Metric Practice Guide, CAN3-Z234.1-79. Both of these d <table cellspacing="0" cellpadding="2">
    11 KB (1,750 words) - 20:54, 3 September 2021
  • :(2) any granular mineral material. ...inute globules of bituminous material in water or in an aqueous solution;:(2) A suspension of minute globules of water or an aqueous solution in a liqui
    76 KB (11,565 words) - 18:09, 26 January 2024
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    5 KB (633 words) - 20:30, 26 July 2021
  • == 11.2.1 <u>Physical Properties</u> == :2 Tensile strength
    11 KB (1,753 words) - 15:02, 4 May 2017
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    5 KB (614 words) - 20:30, 26 July 2021
  • ...be defined as either a THERMOSET (Section 6.1) or THERMOPLASTIC (Section 6.2). * Type 2
    3 KB (465 words) - 20:53, 29 September 2016
  • ...be defined as either a THERMOSET (Section 6.1) or THERMOPLASTIC (Section 6.2). ...fabric or glass fibres, and in thicknesses usually ranging from 1.2 mm to 2.0 mm, depending on the manufacturer. Non-reinforced PVC membranes may typic
    4 KB (470 words) - 20:21, 27 July 2016
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...S-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/a/ae/10.3.2.3.-SBS-E.png]]
    4 KB (584 words) - 15:27, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/8f/10.3.2.3.-TPO-C.png]]
    4 KB (599 words) - 22:20, 23 February 2024
  • ...be defined as either a THERMOSET (Section 6.1) or THERMOPLASTIC (Section 6.2). ...fabric or glass fibres, and in thicknesses usually ranging from 1.2 mm to 2.0 mm, depending on the manufacturer. Non-reinforced PVC membranes may typic
    4 KB (463 words) - 16:20, 20 February 2019
  • ...#11.3.3.2._General_Requirements_for_Cast-iron_Roof_Drains | Article 11.3.3.2.]])</big></big></big></big></big> ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    3 KB (416 words) - 18:00, 27 October 2023
  • [[File:10.3.6.2.jpg| link=http://rpm.rcabc.org/images/7/78/10.3.6.2.jpg | class=img-responsive]] ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    3 KB (334 words) - 18:01, 27 October 2023
  • #REDIRECT [[SBS Details:D1.7.1-2 Assemblies (Protected Membrane)]]
    66 bytes (8 words) - 17:50, 16 September 2016
  • ...jpg‎|class=img-responsive | link=http://rpm.rcabc.org/images/6/62/10.3.1.2.jpg]] ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    3 KB (374 words) - 17:46, 27 October 2023
  • :[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/1/13/D1.7.2-3_Print_Sheet.pdf|'''Print Sheet''']] ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    4 KB (474 words) - 17:59, 27 October 2023
  • ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]:If ;(9) [[SBS Roof Systems Standard#PART_10|'''Wall Tie-in''']]: Minimum 2 mm (0.078") self-adhered modified bitumen or flexible membrane manufacture
    3 KB (402 words) - 17:50, 27 October 2023
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649
    952 bytes (118 words) - 14:48, 27 September 2017
  • ...3.2.7._Railings.2C_Ladders.2C_and_Other_Attached_Structures | Article 12.3.2.7.]])</big></big></big></big></big> [[File:D1.7.36 (View 2).jpg| link=http://rpm.rcabc.org/images/3/39/D1.7.36_%28View_2%29.jpg | clas
    1 KB (195 words) - 18:45, 27 June 2022
  • ...([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])</big></big></big></big></big> ....2 Metal Edge.jpg|class=img-responsive | link=https://rpm.rcabc.org/images/2/2b/SBS_10.3.5.2_Metal_Edge.jpg]]
    3 KB (377 words) - 17:55, 27 October 2023
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...M-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/c/c6/10.3.2.3.-EPDM-B.png]]
    4 KB (580 words) - 16:27, 26 February 2024
  • ;(2) [[SBS Roof Systems Standard#PART_10|'''Expansion joint (elastomeric produc
    2 KB (329 words) - 20:56, 1 November 2022
  • [[File:SBS Low Door Opening.jpg|link=https://rpm.rcabc.org/images/2/26/SBS_Low_Door_Opening.jpg |class=img-responsive]] ;(2) [[SBS Roof Systems Standard#PART_9|'''Field Membrane''']]: SBS-modified bi
    3 KB (478 words) - 22:42, 9 December 2022
  • ;(2) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Carried up
    4 KB (508 words) - 18:51, 27 June 2022
  • ;(2) [[SBS Roof Systems Standard#PART_10|'''Expansion joint (elastomeric produc
    3 KB (382 words) - 16:29, 12 December 2022
  • ...._General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]]; [[SBS_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]]) ...ystems_Standard#10.1.6.2. Control Joints (Roof Dividers) | Article 10.1.6.2.]] concerning permissible design heights for control joints.
    4 KB (522 words) - 20:57, 1 November 2022
  • ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    3 KB (386 words) - 21:52, 16 September 2022
  • ;(2) [[SBS Roof Systems Standard#PART_10|'''Base Membrane Flashing''']]
    3 KB (360 words) - 18:52, 21 September 2022
  • ..._Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])</big></big></big></big></big> [[File:10.3.5.2.jpg| link=http://rpm.rcabc.org/images/3/30/10.3.5.2.jpg | class=img-responsive]]
    3 KB (377 words) - 18:21, 27 October 2023
  • ..._Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])</big></big></big></big></big> ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    3 KB (344 words) - 18:18, 27 October 2023
  • ...cket ([[SBS_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])</big></big></big></big></big> ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    3 KB (381 words) - 18:47, 27 June 2022
  • ...rd#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: I
    3 KB (418 words) - 18:15, 27 October 2023
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    5 KB (576 words) - 20:33, 26 July 2021
  • ===={{hilite | 3.1.1.2. Intent || 2021-October-30 }}==== (See [[Notes to SBS Standard#A-3.1.1.2. | Note A-3.1.1.2.]])
    55 KB (7,359 words) - 21:22, 3 October 2023
  • [[File:Standing Seam Type (Mechanical 2) View 2.jpg]]
    204 bytes (27 words) - 16:30, 9 September 2016
  • ...rpm.rcabc.org/index.php?title=SBS_Roof_Systems_Standard#PART_2 {{hilite | 2 SUPPORTING STRUCTURES: Decks and Walls || 2020-October-21 }}]
    3 KB (366 words) - 18:42, 30 August 2021
  • ...rpm.rcabc.org/index.php?title=EPDM_Roof_Systems_Standard#PART_2 {{hilite | 2 SUPPORTING STRUCTURES: Decks and Walls|| 2021-February-7 }}]
    2 KB (343 words) - 18:18, 31 August 2021
  • .../rpm.rcabc.org/index.php?title=TPO_Roof_Systems_Standard#PART_2 {{hilite | 2 SUPPORTING STRUCTURES: Decks and Walls|| 2021-February-7 }}]
    2 KB (335 words) - 18:43, 30 August 2021
  • ...rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#ASMDECK {{hilite | 2 SUPPORTING STRUCTURES: Decks and Walls || 2021-February-7 }}]
    3 KB (338 words) - 16:00, 2 September 2021
  • ...c.org/index.php?title=Asphalt_Shingle_Systems_Standard#AShDECKS {{hilite | 2 SUPPORTING STRUCTURES: Decks and Walls|| 2021-February-7 }}]
    2 KB (317 words) - 16:03, 31 August 2021
  • ....org/index.php?title=Cedar_Shake_%26_Shingle_Systems_Standard#STR-CS <big>2. Cedar Shingle Roofing (STR-CS)</big>] ...abc.org/index.php?title=Cedar_Shake_%26_Shingle_Systems_Standard#STR-CSGEN 2.1 GENERAL]
    5 KB (715 words) - 16:41, 31 August 2021
  • .../rpm.rcabc.org/index.php?title=PVC_Roof_Systems_Standard#PART_2 {{hilite | 2 SUPPORTING STRUCTURES: Decks and Walls|| 2021-February-7 }}]
    2 KB (333 words) - 20:29, 30 August 2021
  • ...://rpm.rcabc.org/index.php?title=Tile_%26_Slate_Systems_Standard#TILEMAT 1.2 MATERIALS] ...rpm.rcabc.org/index.php?title=Tile_%26_Slate_Systems_Standard#TILEEAVE 1.3.2 Underlayment and Eave Protection]
    3 KB (472 words) - 17:36, 31 August 2021
  • [[File:Thermal Bridging 2.JPG|frameless|link=Insulating the Roof |150px]] <!-- Thumbnail 2-->
    7 KB (990 words) - 20:54, 2 August 2016
  • ...dard establishes three types (Type 1, 2 and 3) and three classes (Class 1, 2 or 3) of polyurethane insulation. The type is determined by the physical pr ...blishes four types (Type 1, 2, 3, or 4), four facing categories (Facing 1, 2, 3, or 4), and two surface burning characteristic classifications (surface
    3 KB (444 words) - 17:15, 17 June 2016
  • ...and water absorption properties decrease from Type 1 to Type 4. (For Type 2 and Type 4 see also section 6 above, <i>Extruded Expanded Polystyrene</i>).
    3 KB (422 words) - 17:14, 17 June 2016
  • #REDIRECT [[SBS Details:D1.7.3-2 Edges & Fascia (Metal Edge Flashing)]]
    71 bytes (10 words) - 20:09, 21 November 2019
  • ...ter exerts a pressure of 1000kg per meter squared per meter of depth or 62.2 pounds per square foot per foot of depth. Standing water is often present o =Part 2 DECKS=
    117 KB (13,071 words) - 18:36, 5 April 2024
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span ...terproofing Guarantee. Note that only overlay boards measuring 12.7 mm (1/2") or more in thickness are acceptable for use in a '''''RoofStar Waterproof
    7 KB (968 words) - 20:34, 26 July 2021
  • ...s)|<i class="fa fa-chevron-circle-right" ></i> <big>Guide Specifications: 2-Ply SBS Membrane Systems</big>]]
    1,009 bytes (109 words) - 20:04, 9 November 2016
  • ...and their applications are detailed in Sections 7.2.1, 7.2.2, 7.2.3 and 7.2.4 of the <b>RGC <i>Roofing Practices Manual.</i></b> ...for use under the RoofStar Guarantee Program are minimum No. 1 Grade (No. 2 Grade acceptable for starter course).
    9 KB (1,344 words) - 14:13, 27 July 2021
  • [[File:6.3.2.1.jpg| link=http://rpm.rcabc.org/images/6/62/6.3.2.1.jpg | class=img-responsive]] ;(2) [[TPO Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically fasten
    3 KB (439 words) - 21:37, 27 June 2022
  • Image:Wind - EFL Flooring, Saskatoon (July 18, 2019) (2 MOD).jpg | Saskatoon, SK Image:Wind - Calgary roof blow-off (2).JPG | Calgary, AB
    2 KB (308 words) - 16:36, 16 March 2023
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...S-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/55/10.3.2.3.-SBS-B.png]]
    4 KB (561 words) - 15:51, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/50/10.3.2.3.-TPO-E.png]]
    4 KB (596 words) - 22:32, 23 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/d/dd/10.3.2.3.-SBS-A.png]]
    6 KB (858 words) - 16:09, 16 February 2024
  • .... Extreme care should be taken when asphalt mopping membranes thicker than 2.3 mm since the heat capacity of the thicker membranes can drop the temperat ...Deck, asphalt recovery board or a minimum No. 40 glass-ply felt (CSA A123.2-M, Type CF).
    22 KB (3,408 words) - 18:30, 9 November 2016
  • ...ep roofing asphalt at a rate of 1.5 kg / m<sup>2</sup> (30 lb / 100 ft<sup>2</sup>) over structural concrete decks. # Install 11 mm (1/2") asphalt impregnated fiberboard or perlite as insulation overlay where req
    12 KB (1,817 words) - 19:27, 7 November 2016
  • # Asphalt-adhered: apply asphalt to substrate at a rate of 1.2 to 1.5 kg / m&#178; (25 to 30 lb / square), at minimum 205&#176;C (400&#176 # Self-adhered: Membranes used in base/cap field or stripping plies in 2 ply assemblies require substrate priming with Elastocol Stick, Elastocol 35
    14 KB (2,024 words) - 18:30, 9 November 2016
  • # As a fully adhered 2-ply (or more) system on flat, curved or domed roofs over most types of insu #* Mechanically fastened over 1:8 (1-1/2" in 12")
    8 KB (1,192 words) - 19:52, 7 November 2016
  • #* Backnail each felt on slopes over: 1:6 (2" in 12") #* Install Tremco vapour retarder with 50 mm (2") side laps and 100 mm (4") end laps, adhering with Tremco Insulation Adhes
    7 KB (942 words) - 20:12, 7 November 2016
  • ...ply directly into the deck at the rate specified above. When slope exceeds 2:12 (17%), install all plies parallel to the slope (strapping) to facilitate <table border="1" cellspacing="0" cellpadding="2">
    16 KB (2,588 words) - 18:14, 9 November 2016
  • :.2 As a high performance fully adhered 2 ply membrane system used to waterproof plaza decks, promenades and terraces :.2 Store rolls on end with selvage edge up, elevated from contact with ground
    8 KB (1,205 words) - 18:26, 9 November 2016
  • ...1 m (39") wide rolls and varies in thickness from 2 mm (0.08") to 5 mm (0.2") depending on use and reinforcement. ...kg / m&#178; (25-30 lb / sq.). Unroll membrane into asphalt a maximum of 1.2 m (4') behind mopping application.
    12 KB (1,673 words) - 19:42, 7 November 2016
  • ...uickly over joint, then press or roll to adhere. Overlap end joints 50 mm (2"). <td align=center nowrap>2 m (80")</td>
    13 KB (1,969 words) - 19:40, 7 November 2016
  • # Slope: Roof slopes which exceed &#189;" in 12" (4.2%) require the following: #*When the slope of the roof exceeds &#189;" in 12" (4.2%) and hot asphalt attachment is specified, Firestone requires Firestone SBE
    21 KB (3,147 words) - 19:39, 7 November 2016
  • ...r><td>Polymax 180</td><td>1.0 mm</td><td>180 P</td><td>0.50</td><td rowpan=2>Spun-bonded polyester mat saturated with asphalt. Hot asphalt-applied.</td> ### Base sheet: asphalt-coated base sheet conforming to CSA A123.2 Type CF; or Hal Industries Inc. No. 30 organic felt.
    19 KB (2,786 words) - 16:54, 4 November 2016
  • ###*; Install Tremco vapour retarder with 50 mm (2&quot;) side laps and 100 mm (4&quot;) end laps, adhering with ribbons of TH ### Embed insulation in a 1.5 kg / m<sup>2</sup> (30 lb / square) mopping of hot THERMastic or hot asphalt over non-na
    20 KB (2,976 words) - 16:55, 4 November 2016
  • ###* Install Permstop Vapour Retarder with 50 mm (2&quot;) side laps and 100 mm (4&quot;) end laps, adhering with ribbons of ad ### On vertical applications, use 2 plies of Johns Manville modified bituminous membrane lapped on the deck 100
    7 KB (992 words) - 16:56, 4 November 2016
  • ..., uniform mopping of hot steep roofing asphalt at a rate of 1.5 kg / m<sup>2</sup> (30 pounds per 100 square feet) over structural concrete decks. ...roofing asphalt at a rate of 1.2 kg / m<sup>2</sup> (25 lb per 100 ft<sup>2</sup>).
    25 KB (3,685 words) - 16:52, 4 November 2016
  • ...ply directly into the deck at the rate specified above. When slope exceeds 2:12 (17%), install all plies parallel to the slope (strapping) to facilitate ##:'''Application''': Cold applied 2 or 3 ply system
    22 KB (3,005 words) - 17:17, 4 November 2016
  • # TRA Fully-Adhered: Install TRA sheeting into a 2.5 to 3.4 L / m&#178; (5 to 7 gal / square) coat of THERMastic (B); overlay ...and adhere laps of adjacent TRA sheets with THERMastic (B) at the rate of 2.5 to 3.4 L / m&#178; (5 to 7 gal / square) ensuring THERMastic (B) extends
    21 KB (3,244 words) - 22:15, 7 November 2016
  • #*maximum slope (ballasted or mechanically-fastened): 1:6 (2" in 12") ...hould not be applied in direct contact with coal tar pitch, Type 1 or Type 2 asphalts, or asphalt that is less than 30 days old.
    46 KB (7,081 words) - 22:47, 7 November 2016
  • ...brane directly onto low melting point asphalt (CSA A123.4-M1979, Type 1 or 2). ::50 mm (2") diameter metal fastening plate
    30 KB (4,433 words) - 22:21, 7 November 2016
  • ...m (100'). Standard thicknesses are 1.11 mm (0.045"), 1.52 mm (0.060") and 2.28 mm (0.090"). Special sizes and thicknesses are also available. ...mbrane directly onto low melting point asphalt (CSA A123.4-M1979, Type 1or 2).
    20 KB (3,027 words) - 23:04, 7 November 2016
  • :.2 Application Temperature: :Pipe Flashings: available for pipes 1/2 inch to 6-1/2 inch diameter.
    9 KB (1,324 words) - 17:09, 8 November 2016
  • .2 A Fully Adhered System uses a mechanically attached substrate (insulation, :.2 Store membrane rolls flat. Take precautions so as not to overload any area
    24 KB (3,556 words) - 22:15, 13 November 2020
  • :.2 Range of application: new construction and reroofing. :.2 Do not apply roofing materials during inclement or threatening weather.
    12 KB (1,686 words) - 17:07, 8 November 2016
  • <table cellspacing="0" cellpadding="2" border=1> <td>4 ft. (1.2 m)</td>
    9 KB (1,238 words) - 17:03, 8 November 2016
  • <table cellspacing="0" cellpadding="2"> ...1px solid black;' rowspan="3" align="left" valign="top">Minimum 12.7 mm (1/2&quot;) required over uninsulated steel decks, mechanically-fastened....
    30 KB (4,666 words) - 17:04, 8 November 2016
  • :.2 Loose-laid roofing membrane under gravel ballast and in protected membrane :.2 Store Sarnafil membrane rolls flat and dry and fully protected from moistur
    42 KB (6,360 words) - 18:54, 9 November 2016
  • ::Sarnafil G476-20, 80 mil (2 mm), thermoplastic flashing membrane with fiberglass reinforcement. :2. <u>Adhesives</u>
    22 KB (3,157 words) - 18:55, 9 November 2016
  • :.2 Range of application: new construction or reroofing; flat to vertical (cons :.2 Store rolls on a pallet, securely covered to prevent contact with moisture.
    36 KB (5,546 words) - 18:22, 8 November 2016
  • :.2 Range of application: new or re-roofing; from dead-flat to vertical (consul :.2 Below O&#176; (+32&#176;F): keep rolls in a heated area; install at once wi
    18 KB (2,577 words) - 20:02, 8 November 2016
  • :.2 The binder in the roofing sheet is the critical component. It provides: .... Extreme care should be taken when asphalt mopping membranes thicker than 2.9 mm since the heat capacity of the thicker membranes can drop the temperat
    10 KB (1,477 words) - 18:28, 9 November 2016
  • ...to waterproof plazas, promenades, and terraces. The total thickness of the 2 ply assembly shall be a mimimum of 6.0mm. :.2 Store rolls on end, selvage edge up, elevated from contact with ground and
    7 KB (1,060 words) - 18:29, 9 November 2016
  • :.2 Do not expose materials subject to water or solar damage in quantities grea :.2 Technical service: technical representatives are available for consultation
    11 KB (1,769 words) - 18:24, 9 November 2016
  • ;1.2 <u>REFERENCES:</u> ::.2 RGC Guarantee Standards [E Waterproofing].
    23 KB (2,972 words) - 19:49, 9 November 2016
  • ;1.2 REFERENCES ::.2 RGC Guarantee Standards [E Waterproofing].
    18 KB (2,262 words) - 19:50, 9 November 2016
  • ;1.2 REFERENCES ::.2 RGC Guarantee Standards [E Waterproofing].
    19 KB (2,419 words) - 19:52, 9 November 2016
  • ;1.2 REFERENCES ::.2 RGC Guarantee Standards [E Waterproofing]
    18 KB (2,332 words) - 19:53, 9 November 2016
  • ===2-Ply SBS Membrane Systems===
    2 KB (212 words) - 15:19, 14 August 2017
  • :.2 Do not expose materials subject to water or solar damage in quantities grea :.2 Technical service: technical representatives are available for consultation
    8 KB (1,226 words) - 22:34, 9 November 2016
  • ::2. Installation of permanent Monitoring Grid with associated Access Closure a ::2. __ __ __ - _____________________.
    12 KB (1,634 words) - 22:57, 9 November 2016
  • ::2. Installation of permanent Monitoring Grid with associated Access Closure a ::2. __ __ __ - _____________________.
    12 KB (1,693 words) - 22:58, 9 November 2016
  • ...(16") shingles, 140 mm (5-1/2") for 455 mm (18") shingles and 190 mm (7-1/2") for 610 mm (24") shingles. On roof slopes less than 1:3 (4" in 12") to a ...ficient nails to hold in place until shingling. Side laps a minimum 50 mm (2") and end laps a minimum 150 mm (6").
    27 KB (4,173 words) - 20:44, 3 September 2021
  • [[File:7.3.2.1.1.jpg]] ...#8216;shingle&#8217; fashion overlapping the fascia by at least 40 mm (1-1/2").
    13 KB (2,003 words) - 20:44, 3 September 2021
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    5 KB (673 words) - 20:32, 26 July 2021
  • #REDIRECT [[SBS 11.3.5-2 Roof Anchors (conventional system)]]
    61 bytes (7 words) - 19:36, 5 December 2019
  • :S-2 rated for 40 to 60 year service Heavies 8 mm - 12 mm (3/8" - 1/2")
    12 KB (1,814 words) - 23:02, 20 October 2022
  • ...or_SBS-Modified_Bitumen_Membrane_Systems_(revised)#PART_2 {{hilite | Part 2 Supporting Structures: Decks and Walls || 2020-October-21 }}]
    3 KB (424 words) - 13:52, 27 August 2021
  • | colspan="2" | <big>To view materials in any section listed below, click on the <span
    5 KB (611 words) - 20:30, 26 July 2021
  • .... General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]] and [[ASM_Roof_Systems_Standard#10.3.4.1. Ridges | Article 10.3.4.1.]] [[File:ASM 10.4.2 Ridge (Unvented, Insulated).jpg|class=img-responsive | link=http://rpm.rcab
    3 KB (425 words) - 18:24, 28 June 2022
  • ...are unitized (for example, pavers on pedestals) and do not exceed 1 M<sup>2</sup> or 90 Kg (200 lb.) per unit.
    9 KB (1,253 words) - 22:33, 12 November 2021
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...S-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/8d/10.3.2.3.-SBS-F.png]]
    4 KB (602 words) - 15:37, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b6/10.3.2.3.-TPO-B.png]]
    4 KB (577 words) - 22:16, 23 February 2024
  • .... General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]] and [[ASM_Roof_Systems_Standard#10.3.4.1. Ridges | Article 10.3.4.1.]] ;(2) [[ASM Roof Systems Standard#8.1.3.5. Ventilation Beneath Panels|'''Ventila
    3 KB (410 words) - 18:24, 28 June 2022
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-D.png |class=img-responsive | link=https://rpm.rcabc.org/images/9/92/10.3.2.3.-SBS-D.png]]
    4 KB (582 words) - 15:27, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-D.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/57/10.3.2.3.-TPO-D.png]]
    4 KB (596 words) - 22:28, 23 February 2024
  • :<big>[[Table Drafts 2 | Technical Committee composition]]</big> ...clusions of Guarantee | Limitations and Exclusions (draft of Article 3.2.1.2., Guarantee, Div. A)]]</big>
    1 KB (195 words) - 15:12, 26 October 2023
  • ...[[Asphalt_Shingle_Systems_Standard#9.3.2.7. Changes in Slope | Article 9.3.2.7.]])</big></big></big></big></big> ...d upslope past the edge of the lower slope underlayment by at least 50 mm (2”).
    2 KB (302 words) - 14:04, 28 September 2022
  • ...[[Asphalt_Shingle_Systems_Standard#9.3.2.7. Changes in Slope | Article 9.3.2.7.]])</big></big></big></big></big> ...Outside Angle.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/2/2c/ASh_9.1.4_CD.jpg]]
    2 KB (303 words) - 14:01, 28 September 2022
  • ...lt_Shingle_Systems_Standard#10.1.4.2. Eave and Rake Edges | Article 10.1.4.2.]])</big></big></big></big></big> ....jpg|class=img-responsive | link=http://rpm.rcabc.org/images/9/90/ASh_10.1.2-2_CD.jpg]]
    3 KB (385 words) - 14:28, 30 June 2022
  • ...ttp://rpm.rcabc.org/images/e/ef/ASh_10.5.1-1_CD.jpg]] || [[File:ASh 10.5.1-2 CD.jpg | class=img-responsive | link=http://rpm.rcabc.org/images/f/fe/ASh_1 ;(2) [[Asphalt Shingle Systems Standard#AShVALLEYMETAL|'''Valley Metal Flashing
    3 KB (466 words) - 14:27, 30 June 2022
  • <div id=A-1.1.3.2.></div> :<big>'''A-1.1.3.2.'''</big> ('''Snow Loads''')
    27 KB (3,999 words) - 15:35, 14 November 2023
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-1(Conventionally Insulated roof waterproofing system)(Click to expand)</sma
    59 KB (8,538 words) - 18:07, 2 April 2024
  • ...([[ASM_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])</big></big></big></big></big> ...class=img-responsive | link=https://rpm.rcabc.org/images/d/d0/Figure_6.3.1-2.jpg]]
    3 KB (425 words) - 14:36, 28 June 2022
  • :[[EPDM Details:D2.7.5-2 Roof-Wall Transitions (Divider/Joint)|D2.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']] :[[EPDM Details:D2.7.2-1 Parapets & Copings (High - Wall Supported)|D2.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
    13 KB (1,837 words) - 15:31, 14 November 2019
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...S-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/4/43/10.3.2.3.-SBS-C.png]]
    4 KB (584 words) - 15:38, 26 February 2024
  • ...text-align:center;" | 31.25, 37.5, 50, 75, 100, 125, 150<br>(1-1/4, 1-1/2, 2, 3, 4, 5, 6) || style="text-align:center;" | Aluminum || style="text-align: ...yle="text-align:center;" | 31.25, 37.5, 50, 75, 100, 125<br>(1-1/4, 1-1/2, 2, 3, 4, 5) || style="text-align:center;" | Aluminum || style="text-align:cen
    1 KB (141 words) - 13:52, 27 July 2021
  • #REDIRECT [[SBS 2 - 2.5 Control Joint (Roof Divider)]]
    54 bytes (7 words) - 22:34, 4 December 2019
  • #REDIRECT [[SBS 10.3.5.1-2 Parapet (independent of roof structure)(typical)]]
    77 bytes (9 words) - 17:29, 5 December 2019
  • #REDIRECT [[SBS 10.3.5.2-2 Cant Edge]]
    38 bytes (5 words) - 17:34, 5 December 2019
  • #REDIRECT [[SBS 10.3.9-2 Roof-Wall Transitions (fire separation wall)]]
    71 bytes (8 words) - 18:23, 5 December 2019
  • #REDIRECT [[SBS 11.3.2.4-2 Flange-style Drains (clamping)]]
    59 bytes (6 words) - 19:30, 5 December 2019
  • #REDIRECT [[SBS 11.3.3.2-2 Curbs and Sleepers (equipment sleeper)]]
    67 bytes (8 words) - 19:32, 5 December 2019
  • #REDIRECT [[SBS 11.3.3.3-2 Penetration Flashings (two-part cable)]]
    67 bytes (7 words) - 19:35, 5 December 2019
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...M-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/c/c6/10.3.2.3.-EPDM-B.png]]
    4 KB (577 words) - 15:01, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-C.png |class=img-responsive | link=https://rpm.rcabc.org/images/b/be/10.3.2.3.-EPDM-C.png]]
    4 KB (600 words) - 15:02, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/5/53/10.3.2.3.-EPDM-A.png]]
    6 KB (837 words) - 15:01, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-D.png |class=img-responsive | link=https://rpm.rcabc.org/images/7/74/10.3.2.3.-EPDM-D.png]]
    4 KB (596 words) - 15:30, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-E.png |class=img-responsive | link=https://rpm.rcabc.org/images/a/ad/10.3.2.3.-EPDM-E.png]]
    4 KB (598 words) - 15:24, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...M-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/d/d3/10.3.2.3.-EPDM-F.png]]
    5 KB (617 words) - 15:47, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/f/fc/10.3.2.3.-PVC-A.png]]
    6 KB (839 words) - 15:04, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/7/7b/10.3.2.3.-PVC-B.png]]
    4 KB (576 words) - 15:09, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-D.png |class=img-responsive | link=https://rpm.rcabc.org/images/7/74/10.3.2.3.-EPDM-D.png]]
    4 KB (599 words) - 16:28, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-E.png |class=img-responsive | link=https://rpm.rcabc.org/images/a/ad/10.3.2.3.-EPDM-E.png]]
    4 KB (601 words) - 16:29, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...M-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/d/d3/10.3.2.3.-EPDM-F.png]]
    5 KB (620 words) - 16:30, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/f/fb/10.3.2.3.-TPO-A.png]]
    6 KB (842 words) - 16:35, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b6/10.3.2.3.-TPO-B.png]]
    4 KB (580 words) - 16:36, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/8f/10.3.2.3.-TPO-C.png]]
    4 KB (602 words) - 16:37, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-D.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/57/10.3.2.3.-TPO-D.png]]
    4 KB (599 words) - 16:38, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/50/10.3.2.3.-TPO-E.png]]
    4 KB (599 words) - 16:38, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/0/02/10.3.2.3.-TPO-F.png]]
    5 KB (617 words) - 16:39, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/f/fc/10.3.2.3.-PVC-A.png]]
    6 KB (842 words) - 16:41, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/7/7b/10.3.2.3.-PVC-B.png]]
    4 KB (579 words) - 16:42, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/88/10.3.2.3.-PVC-C.png]]
    4 KB (601 words) - 16:42, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-D.png|class=img-responsive | link=https://rpm.rcabc.org/images/3/3c/10.3.2.3.-PVC-D.png]]
    4 KB (600 words) - 16:43, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b6/10.3.2.3.-PVC-E.png]]
    4 KB (601 words) - 16:44, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b9/10.3.2.3.-PVC-F.png]]
    5 KB (619 words) - 16:44, 26 February 2024
  • ...ter exerts a pressure of 1000kg per meter squared per meter of depth or 62.2 pounds per square foot per foot of depth. Standing water is often present o =Part 2 DECKS=
    117 KB (13,068 words) - 18:35, 5 April 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/88/10.3.2.3.-PVC-C.png]]
    4 KB (598 words) - 15:29, 16 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-D.png|class=img-responsive | link=https://rpm.rcabc.org/images/3/3c/10.3.2.3.-PVC-D.png]]
    4 KB (597 words) - 15:31, 16 February 2024
  • ...([[TPO_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])</big></big></big></big></big> ...class=img-responsive | link=https://rpm.rcabc.org/images/d/d0/Figure_6.3.1-2.jpg]]
    3 KB (417 words) - 21:46, 27 June 2022
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b6/10.3.2.3.-PVC-E.png]]
    4 KB (598 words) - 15:24, 16 February 2024
  • ...[[EPDM_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])</big></big></big></big></big> ...class=img-responsive | link=https://rpm.rcabc.org/images/d/d0/Figure_6.3.1-2.jpg]]
    3 KB (423 words) - 21:55, 27 June 2022
  • | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#649 ;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SB
    2 KB (301 words) - 15:36, 5 October 2020
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...C-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b9/10.3.2.3.-PVC-F.png]]
    4 KB (616 words) - 15:26, 16 February 2024
  • <div id=A-1.1.3.2.></div> :<big>'''A-1.1.3.2.'''</big> ('''Snow Loads''')
    32 KB (4,655 words) - 13:53, 9 April 2024
  • [[File:SBS 1.3.1-2 (Optional Hot Works).jpg|class=img-responsive | link=http://rpm.rcabc.org/i ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layer''']]: In
    4 KB (613 words) - 17:37, 27 October 2023
  • ...([[ASM_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])</big></big></big></big></big> ...class=img-responsive | link=https://rpm.rcabc.org/images/d/d0/Figure_6.3.1-2.jpg]]
    3 KB (426 words) - 14:49, 28 October 2022
  • ...alt_Shingle_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])</big></big></big></big></big> ...class=img-responsive | link=https://rpm.rcabc.org/images/d/d0/Figure_6.3.1-2.jpg]]
    3 KB (396 words) - 14:29, 30 June 2022
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> ...class=img-responsive | link=https://rpm.rcabc.org/images/d/d0/Figure_6.3.1-2.jpg]]
    4 KB (517 words) - 22:22, 27 June 2022
  • ;(2) [[PVC Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically attach
    3 KB (383 words) - 22:12, 27 June 2022
  • ;(2) [[PVC Roof Systems Standard#PART_9|'''Single-ply Membrane''']]: Installed
    3 KB (444 words) - 22:19, 27 June 2022
  • [[File:6.3.2.1.jpg| link=http://rpm.rcabc.org/images/6/62/6.3.2.1.jpg | class=img-responsive]] ;(2) [[PVC Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically fasten
    3 KB (439 words) - 22:16, 27 June 2022
  • #REDIRECT [[PVC 1.3.1-2 Conventionally Insulated System (adhered)]]
    67 bytes (7 words) - 19:30, 18 February 2020
  • #REDIRECT [[TPO 1.3.1-2 Conventionally Insulated System (adhered)]]
    67 bytes (7 words) - 19:41, 18 February 2020
  • #REDIRECT [[EPDM 1.3.1-2 Conventionally Insulated System (adhered)]]
    68 bytes (7 words) - 19:45, 18 February 2020
  • ! colspan="1" rowspan="2" style=style="width:250px; vertical-align:center;text-align:center;" | Ma ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    18 KB (2,674 words) - 16:27, 15 November 2021
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/f/fb/10.3.2.3.-TPO-A.png]]
    6 KB (839 words) - 22:13, 23 February 2024
  • ...rd#12.3.2.1. General Requirements for Flashing Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> ...ng or mechanically fastened, depending upon the designed slope (see '''8.1.2 Design'''). Install “shingle-style” and overlap roll ends at least 150
    3 KB (376 words) - 20:36, 2 May 2024
  • | colspan="2" | An ''Accessory'' is a material that joins ''Primary'' or ''Secondary Ma
    7 KB (897 words) - 18:41, 8 June 2023
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    213 KB (30,117 words) - 17:36, 18 November 2021
  • :<big>[[Draft CD 2 | EPDM Membrane Termination B]]</big> :<big>[[CSA Tested Assemblies Draft 2 | Draft - PARS Page (complete layout)]]</big>
    4 KB (536 words) - 14:57, 16 February 2024
  • ! colspan="1" rowspan="2" style=style="width:250px; vertical-align:center;text-align:center;" | Ma ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    9 KB (1,263 words) - 16:26, 18 November 2021
  • ! colspan="1" rowspan="2" style=style="width:250px; vertical-align:center;text-align:center;" | Ma ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    18 KB (2,683 words) - 16:29, 15 November 2021
  • ! colspan="1" rowspan="2" style=style="width:250px; vertical-align:center;text-align:center;" | Ma ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    18 KB (2,682 words) - 16:29, 15 November 2021
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-1(Conventionally insulated roof waterproofing system)(Click to expand)</sma
    57 KB (8,227 words) - 18:02, 2 April 2024
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-1(Conventionally Insulated roof waterproofing system)(Click to expand)</sma
    57 KB (8,227 words) - 18:07, 2 April 2024
  • <div id=A-1.1.3.2.></div> :<big>'''A-1.1.3.2.'''</big> ('''Snow Loads''')
    31 KB (4,535 words) - 15:47, 27 October 2023
  • <div id=A-1.1.3.2.></div> :<big>'''A-1.1.3.2.'''</big> ('''Snow Loads''')
    27 KB (3,996 words) - 15:35, 14 November 2023
  • :<big>[[Template:Part 2 - SBS]]</big> :<big>[[Template:Part 2 - EPDM]]</big>
    5 KB (731 words) - 17:52, 18 October 2022
  • ====3.1.2. Framework of RoofStar Guarantee==== =====<big>3.1.2.1. Overview</big>=====
    15 KB (2,129 words) - 19:29, 1 February 2024
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    5 KB (586 words) - 18:01, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    5 KB (603 words) - 18:01, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    5 KB (572 words) - 18:02, 18 November 2021
  • :[[Materials:Elastoflex S6 2.2|Elastoflex S6 2.2 (S/S, P/S, P/P)]] :[[Materials:Elastoflex S6 2.5|Elastoflex S6 2.5 (S/S, P/S)]]
    6 KB (821 words) - 19:14, 31 January 2024
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-1(Conventionally Insulated roof waterproofing system)(Click to expand)</sma
    61 KB (8,812 words) - 18:01, 2 April 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...O-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/0/02/10.3.2.3.-TPO-F.png]]
    4 KB (614 words) - 22:36, 23 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/d/dd/10.3.2.3.-SBS-A.png]]
    6 KB (861 words) - 15:55, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...S-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/55/10.3.2.3.-SBS-B.png]]
    4 KB (564 words) - 15:56, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...S-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/4/43/10.3.2.3.-SBS-C.png]]
    4 KB (587 words) - 15:57, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/5/53/10.3.2.3.-EPDM-A.png]]
    6 KB (840 words) - 16:26, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-D.png |class=img-responsive | link=https://rpm.rcabc.org/images/9/92/10.3.2.3.-SBS-D.png]]
    4 KB (585 words) - 15:58, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...S-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/a/ae/10.3.2.3.-SBS-E.png]]
    4 KB (587 words) - 15:59, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...S-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/8d/10.3.2.3.-SBS-F.png]]
    4 KB (605 words) - 16:00, 26 February 2024
  • ...._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> ...-C.png |class=img-responsive | link=https://rpm.rcabc.org/images/b/be/10.3.2.3.-EPDM-C.png]]
    4 KB (603 words) - 16:27, 26 February 2024
  • | colspan="2" | '''NOTICE TO READER''': This is an <u>information page only</u>. To re ...be defined as either a THERMOSET (Section 6.1) or THERMOPLASTIC (Section 6.2).
    33 KB (4,674 words) - 16:01, 9 September 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    10 KB (1,336 words) - 17:39, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    11 KB (1,416 words) - 17:39, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    5 KB (662 words) - 17:40, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    8 KB (1,003 words) - 17:40, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    246 KB (34,400 words) - 18:00, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    14 KB (1,827 words) - 17:38, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="width:100px; vertical-align:top;background-color:#c8ccd
    309 KB (42,619 words) - 17:38, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    8 KB (993 words) - 17:36, 18 November 2021
  • ! colspan="1" rowspan="2" style="width:200px; vertical-align:center;text-align:center;" | Manufact ! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic
    28 KB (3,792 words) - 17:37, 18 November 2021
  • .../index.php?title=Structure_and_Organization_of_RPM_and_Standards <big>Part 2 - Structure and Organization</big> <i class="fa fa-angle-double-right"></i>
    1 KB (185 words) - 16:52, 31 January 2022
  • :Part 2: The Building Code and wind Image:Wind - Mission hotel - Dec 20 2018 (2).jpg | <small>Mission, BC (RCABC)</small>
    3 KB (428 words) - 16:30, 16 March 2023
  • :Part 2: The Building Code and wind ...Regardless of new construction or replacement work[[#Footnotes|<sup><small>2</small></sup>]], the ''Design Authority'' could be any of the following:
    18 KB (2,705 words) - 14:44, 4 November 2021
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    260 KB (36,048 words) - 21:32, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    465 KB (62,116 words) - 21:20, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    423 KB (57,312 words) - 21:21, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    420 KB (56,956 words) - 21:23, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    415 KB (56,426 words) - 21:31, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | PART 2 - Supporting Structures: Decks and Walls]]
    235 KB (33,160 words) - 21:33, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    294 KB (41,687 words) - 21:32, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    466 KB (62,225 words) - 22:19, 5 April 2024
  • ...rs used to attach panel clips to steel to be No. 10 - 16 pancake head, No. 2 Phillips drive, No. 3 self-drilling point steel screws.) #(description, i.e., Minimum roof slope is 1:6 (2" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8"
    4 KB (625 words) - 18:59, 10 February 2022
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-1(Conventionally Insulated roof waterproofing system)(Click to expand)</sma
    61 KB (8,848 words) - 18:15, 2 April 2024
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-1(Conventionally Insulated roof waterproofing system)(Click to expand)</sma
    59 KB (8,541 words) - 18:06, 2 April 2024
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-1(Conventionally insulated roof waterproofing system)(Click to expand)</sma
    57 KB (8,230 words) - 18:16, 2 April 2024
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-1(Conventionally Insulated roof waterproofing system)(Click to expand)</sma
    57 KB (8,230 words) - 18:16, 2 April 2024
  • ...([[SBS_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])</big></big></big></big></big> ...class=img-responsive | link=https://rpm.rcabc.org/images/d/d0/Figure_6.3.1-2.jpg]]
    3 KB (397 words) - 17:38, 27 October 2023
  • #REDIRECT [[SBS 1.1.3.-2 Conventionally Insulated System (alternate)]]
    70 bytes (7 words) - 16:30, 10 June 2022
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-2 (Protected roof system)(Click to expand)</small> || 2021-February-7 }}
    41 KB (6,077 words) - 18:11, 2 April 2024
  • ...oofing system'' is illustrated below in '''Figures 1.3.2-1''' and '''1.3.2-2'''. See also Article 1.1.1.4., "Definitions". |+{{hilite | <small>Figure 1.3.2-2 (Protected roof system)(Click to expand)</small> || 2021-February-7 }}
    41 KB (6,080 words) - 18:16, 2 April 2024
  • | colspan="2" | <big>'''''Notice to Reader'''''</big> [[File:D3.7.8(2).jpg|class=img-responsive]]
    4 KB (592 words) - 18:24, 21 September 2022
  • #REDIRECT [[Working Page 2]]
    28 bytes (3 words) - 20:48, 23 October 2023
  • :[[Materials:2-1 SopraSmart Board |2-1 SopraSmart Board]] <small>(formerly Soprasmart Board 180)</small> :[[Materials:2-1 SopraSmart Board ISO HD|2-1 SopraSmart Board ISO HD]] <small>(formerly Soprasmart ISO HD 180)</small>
    16 KB (2,087 words) - 17:35, 13 June 2023
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | Part 2 - Supporting Structures: Decks and Walls]]
    261 KB (36,152 words) - 22:24, 5 April 2024
  • ..._and_Standards#2.3.1.2._Authority_and_Conflict | Division A, Article 2.3.1.2.]] shall be applied. | [[#PART_2 | PART 2 - Supporting Structures: Decks and Walls]]
    236 KB (33,264 words) - 22:24, 5 April 2024
  • ====3.1.2. Framework of RoofStar Guarantee==== =====<big>3.1.2.1. Overview</big>=====
    15 KB (2,126 words) - 19:28, 1 February 2024

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)